Spalding M88604C1 manual Side View, Build drainage hill

Page 6

3.

 

Fill hole with concrete. Tamp down concrete to release air pockets

 

and build drainage hill.

DRAINAGE HILL

1" (2.54 cm)

PLAYING SURFACE

SIDEVIEW

4. Insert rebar (10) through holes in ground tube assembly (2) as shown.

2

10

10

10

ID# M88604C1

08/06

6

Image 6
Contents High End Residential In-Ground Basketball System Required Tools and Materials Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas shown Playing Surface Mounting plate 2 as shownCompleted Assembly 08/06 ID# M88604C1 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Yokes 18 Using TWO people to hold the boardAttach backboard 13 to upper and lower First attach board 13 to upper yokeEnd of the rod as shown Figure a Install net 4 to rim as shown Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Screws 29 into place with a phillips-head screwdriver08/06 ID# M88604C1 After pole has been secured to the anchor plate 2 loosen nut Feet 05 m Limited Lifetime Warranty