Spalding M88604C1 manual Install nuts 25 onto the ground tube bolts as shown

Page 5

1.

Ensure ground is level with playing surface, then dig pole hole.

24" (61 cm)

WARNING!

GROUND SURFACE

24" (61 cm)

48" (121.9 cm)

PLAYING SURFACE

CONTACT UTILITIES BEFORE DIGGING.

48" (121.9 cm)

2.

Install nuts (25) onto the ground tube bolts as shown.

25

2

NOTE:

Nuts on the top of the plate are used for leveling the pole after system is fully assembled.

5

08/06

ID# M88604C1

Image 5
Contents High End Residential In-Ground Basketball System Required Tools and Materials Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Build drainage hill Side ViewPlaying Surface Insert bushings 19 into areas shown Mounting plate 2 as shown Playing SurfaceCompleted Assembly 08/06 ID# M88604C1 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Attach backboard 13 to upper and lower Using TWO people to hold the boardYokes 18 First attach board 13 to upper yokeEnd of the rod as shown Figure a Attach height indicators Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown Screws 29 into place with a phillips-head screwdriver08/06 ID# M88604C1 After pole has been secured to the anchor plate 2 loosen nut Feet 05 m Limited Lifetime Warranty