Spalding M88604C1 manual Completed Assembly

Page 10

8.

TWO people are required to lift pole into position so that the threaded assembly rod (14) can be installed and secured by the THIRD person.

While pole is being supported by TWO capable adults, position rod (14) and lock into place with hitch pin (8) and cotter pin

(9).

Slide barrel washer (15) onto other end of rod (14) and secure with washer (24) and nut (26). Tighten nut (26) until it is positioned at 3-3/4” from the end of the rod (14) as shown (Figure A)

26

 

24

1

15

 

WARNING!

THREE CAPABLE ADULTS

REQUIRED FOR THIS

PROCEDURE. FAILURE TO

FOLLOW THIS WARNING

COULD RESULT IN

SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

Completed Assembly

1

14 9

8

26

FIGURE

A.

14

ID# M88604C1

08/06

10

Image 10
Contents High End Residential In-Ground Basketball System Required Tools and Materials Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas shown Playing Surface Mounting plate 2 as shownCompleted Assembly 08/06 ID# M88604C1 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Yokes 18 Using TWO people to hold the boardAttach backboard 13 to upper and lower First attach board 13 to upper yokeEnd of the rod as shown Figure a Install net 4 to rim as shown Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Screws 29 into place with a phillips-head screwdriver08/06 ID# M88604C1 After pole has been secured to the anchor plate 2 loosen nut Feet 05 m Limited Lifetime Warranty