Spalding manual 08/06 ID# M88604C1

Page 17

16.

WARNING!

THREE CAPABLE ADULTS REQUIRED FOR THIS

PROCEDURE. TWO PEOPLE ARE REQUIRED TO

GUIDE AND SUPPORT THE SYSTEM WHILE THE

THIRD PERSON IS TIGHTENING NUT (26) TO

RAISE THE SYSTEM UPRIGHT.

FAILURE TO FOLLOW THIS WARNING COULD

RESULT IN SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

Upright pole (1) by tightening nut (26).

Using 15/16” wrench, turn nut (26) clockwise to begin standing pole upright. Continue to turn nut (26) until pole has come to rest against washers (24) and pole is vertical.

Once pole is in its final position, install washers (24) and nuts (25) onto bolts (19) and fully tighten to secure pole to anchor plate.

 

1

WARNING

WARNING!

1

26

19

24

THREE CAPABLE ADULTS

REQUIRED FOR THIS

PROCEDURE. FAILURE TO

FOLLOW THIS WARNING

COULD RESULT IN

SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

25

24

19

PLAYINGSURFACE

17

08/06

ID# M88604C1

Image 17
Contents High End Residential In-Ground Basketball System Required Tools and Materials Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Build drainage hill Side ViewPlaying Surface Insert bushings 19 into areas shown Mounting plate 2 as shown Playing SurfaceCompleted Assembly 08/06 ID# M88604C1 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Attach backboard 13 to upper and lower Using TWO people to hold the boardYokes 18 First attach board 13 to upper yokeEnd of the rod as shown Figure a Attach height indicators Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown Screws 29 into place with a phillips-head screwdriver08/06 ID# M88604C1 After pole has been secured to the anchor plate 2 loosen nut Feet 05 m Limited Lifetime Warranty