Spalding M88604C1 manual After pole has been secured to the anchor plate 2 loosen nut

Page 18

17.

After pole has been secured to the anchor plate (2) loosen nut (26),

 

remove cotter pin (9), and pull out pin (8). This will allow the removal

of the assembly rod (14) which is no longer necessary for the remainder of the assembly and installation of system.

WARNING!

ONLY AFTER THE ANCHOR PLATE HAS BEEN FULLY TIGHTENED: Remove cotter pin (9) and pin (8) to remove threaded assembly rod (14) from anchor plate (2).

26

24

15

14

9

8

25

ID# M88604C1

08/06

18

Image 18
Contents High End Residential In-Ground Basketball System Required Tools and Materials Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas shown Playing Surface Mounting plate 2 as shownCompleted Assembly 08/06 ID# M88604C1 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Yokes 18 Using TWO people to hold the boardAttach backboard 13 to upper and lower First attach board 13 to upper yokeEnd of the rod as shown Figure a Install net 4 to rim as shown Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Screws 29 into place with a phillips-head screwdriver08/06 ID# M88604C1 After pole has been secured to the anchor plate 2 loosen nut Feet 05 m Limited Lifetime Warranty