Spalding manual 08/06 ID# M88604C1

Page 11

9.

While still in forward position, attach both upper and lower yokes (17 & 18) to pole as shown.

WARNING!

THREE CAPABLE ADULTS

REQUIRED FOR THIS

PROCEDURE. FAILURE TO

FOLLOW THIS WARNING

COULD RESULT IN

SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

17

18

21

28

22

21

11

08/06

ID# M88604C1

Image 11
Contents High End Residential In-Ground Basketball System Required Tools and Materials Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Build drainage hill Side ViewPlaying Surface Insert bushings 19 into areas shown Mounting plate 2 as shown Playing SurfaceCompleted Assembly 08/06 ID# M88604C1 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket First attach board 13 to upper yoke Using TWO people to hold the boardAttach backboard 13 to upper and lower Yokes 18End of the rod as shown Figure a Screws 29 into place with a phillips-head screwdriver Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Install net 4 to rim as shown08/06 ID# M88604C1 After pole has been secured to the anchor plate 2 loosen nut Feet 05 m Limited Lifetime Warranty