Spalding M88604C1 manual Feet 05 m

Page 19

18. Check system leveling. Pole (1) should be level in all directions. After system is leveled, completely tighten all nuts (25).

1

25

2

19.

Apply height adjust ment label (11).

Adjust system by turning crank until desired height is reached per height indicator (30).

WARNING!

READ AND UNDERSTAND

WARNING & HEIGHT

ADJUSTMENT LABELS

BEFORE USING THIS UNIT.

FAILURE TO FOLLOW

OPERATING INSTRUCTIONS

COULD RESULT IN INJURY

OR DAMAGE TO PROPERTY.

NOTE:

If adjustment is necessary, adjust system by rotating the nuts (25) between anchor plate (2) and pole flange.

30

10 feet

12

(3.05 m)

11

 

19

08/06

ID# M88604C1

Image 19
Contents High End Residential In-Ground Basketball System Required Tools and Materials Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Build drainage hill Side ViewPlaying Surface Insert bushings 19 into areas shown Mounting plate 2 as shown Playing SurfaceCompleted Assembly 08/06 ID# M88604C1 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket First attach board 13 to upper yoke Using TWO people to hold the boardAttach backboard 13 to upper and lower Yokes 18End of the rod as shown Figure a Screws 29 into place with a phillips-head screwdriver Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Install net 4 to rim as shown08/06 ID# M88604C1 After pole has been secured to the anchor plate 2 loosen nut Feet 05 m Limited Lifetime Warranty