
INTRODUCTION IMPORTANT
PRECAUTIONS
ASSEMBLY
BEFORE ASCENT TRAINER CONDITIONING TROUBLESHOOTING LIMITED
YOU BEGIN OPERATION GUIDELINES & MAINTENANCE WARRANTY
14
ASSEMBLY STEP 8
HARDWARE BAG 8 CONTENTS: |
|
|
|
BOLT (C) | WASHER (D) | WAVY WASHER (J) | AXLE |
16 mm | 25 mm | 29 mm | Qty: 2 |
Qty: 6 | Qty: 6 | Qty: 2 |
|
ASSEMBLY STEP 8:
TOP HANDRAIL
CRANK
| BOLT (C) |
WASHER (D) | |
WAVY WASHER (J) | CRANK CAP |
| |
BOLT (C)
WASHER (D)
SWING CAP
AXLE
BOLT (C)
SWING CAP
WASHER (D)
RIGHT SWING ARM
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
PEDAL ARM
LINK ARM
PACKAGING PLASTIC ![]()
ALay waste packaging plastic over the BASE RAIL. This will prevent the PEDAL ARM assembly from scratching the ascent trainer’s paint.
BOpen HARDWARE BAG 8.
CPlace 1 WAVY WASHER (J) onto CRANK.
DAttach the right PEDAL ARM of the assembly to the right CRANK using 1 WASHER (D) and 1 BOLT (C).
EAttach right SWING ARM to TOP HANDRAIL using 2 SWING CAPS, 2 BOLTS (C), 1 SHAFT and 2 WASHERS (D).
FAttach the CRANK CAP to the CRANK
GRepeat on opposite side.
ASSEMBLY STEP 9
HARDWARE BAG 9 CONTENTS: |
|
|
|
|
BOLT (N) | WASHER (L) | ROD BEARING | SPACER | NUT (G) |
45 mm | 18 mm | SHAFT | Qty: 4 | 8 mm |
Qty: 2 | Qty: 2 | Qty: 2 |
| Qty: 2 |
ASSEMBLY STEP 9:
LOWER
HANDLEBAR
WASHER (L)
NUT (G)
BOLT (N)
SPACER |
|
ROD BEARING | SPACER |
SHAFT | |
| LINK ARM |
AOpen HARDWARE BAG 9.
BSlide 1 ROD BEARING SHAFT into the joint end of right LINK ARM.
CFit 1 SPACER on each side of each ROD BEARING SHAFT after the ROD BEARING SHAFTS are in LINK ARM.
DAttach right LINK ARM to the right LOWER HANDLEBAR using 1 BOLT (N), 1 WASHER (L) and 1 NUT (G).
ERepeat on opposite side.
15
IMPORTANT PRECAUTIONS INTRODUCTION
ASSEMBLY
LIMITED TROUBLESHOOTING CONDITIONING ASCENT TRAINER BEFORE WARRANTY & MAINTENANCE GUIDELINES OPERATION YOU BEGIN
AT1501_Rev.2.6.indd | 7/31/08 12:43:49 PM |