![](/images/new-backgrounds/1298410/29841015x1.webp)
7.Lubricate both axles on the Top Frame (55). Slide the Right Arm (48) onto the right axle. Note: Be careful not to confuse the Right Arm with the Left Arm (47); refer to step 6 to identify the Right Arm. Be sure that the upper end of the Right Arm is behind the indicated bracket on the Top Frame.
Tap two 25mm Retainers (63) and a 25mm Round Cover Cap (62) onto the right axle. Be sure that the teeth on the Retainers bend toward the Cover Cap, as shown in the inset drawing.
Attach the Left Arm (47) in the same manner.
Press 45mm Square Inner Caps (44) into the lower ends of the Right and Left Arms (47, 48). Wet the lower end of each Arm with soapy water. Slide a Large Foam Pad (45) onto the lower end of each Arm.
CABLE ASSEMBLY
8.During steps 9 through 22, refer to the CABLE DIAGRAM on page 20 of this manual to verify proper cable routing. Before beginning this sec- tion, identify the Short Cable (23) and the Long Cable (58) by comparing the lengths and the ends of the cables.
IMPORTANT: While assembling the cables, do not overtighten the bolts and nuts securing the pulleys; the pulleys must turn freely.
9.Locate the Long Cable (58). Route the Long Cable around a 90mm Pulley (15).
Using an M10 x 90mm Bolt (16) and an M10 Nylon Locknut (21), attach the 90mm Pulley (15) to the Top Frame (55) in the indicated location. Be sure that the end of the Cable with the ball is on the indicated side of the Pulley and that the Cable is between the Pulley and the hook on the Top Frame.
8
7 | 55 |
| 47 |
|
| ||
|
|
| |
|
| Bracket | |
|
| Lubricate | |
|
| Axle |
|
48 |
| 63 |
|
|
|
| |
|
| 62 | 45 |
44 |
|
|
|
|
| 55 | |
45 |
|
| 63 |
|
|
| 62 |
8 |
|
|
|
58 |
|
|
|
23 |
|
|
|
9 |
|
|
|
21 | 15 | 55 | 58 |
| |||
Ball |
| 16 |
|
Hook |
|