American Dryer Corp ML-79 manual Preparation for Operation and START-UP

Page 30

I. PREPARATION FOR OPERATION AND START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALL “CAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the back side of the top front control and service door. In the case of 208 VAC or 230/240

VAC, THE SUPPLY VOLTAGE MUST MATCH THE ELECTRIC SERVICE EXACTLY.

3.GAS MODELS - Check to assure that the dryer is connected to the type of heat or gas indicated on the dryer data label.

4.GAS & ELECTRIC MODELS -The sail switch damper assembly was installed and adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning.

5.GAS MODELS - Be sure that ALL gas shut-off valves are in the open position.

6.Be sure ALL side and base panels are on the dryer.

7.Check ALL service doors to assure that they are closed and secure.

8.Be sure the lint door is securely in place.

9.Rotate the basket (tumbler and drum) by hand to be sure it moves freely.

10.Check bolts, nuts, screws, terminals and fittings for security.

11.Check to ensure all back guards and covers are on the dryer.

12.Check to ensure air supply is connected to the dryer (40 p.s.i.).

13.Check to ensure that all shipping blocks and braces have been removed.

26

Image 30
Contents What do YOU do if YOU Smell GAS QUE Faire SI Vous Sentez UNE Odeur DE GAZFor Your Safety Pour Votre Sécurité Retain This Manual In a Safe Place For Future ReferenceFor Your Safety Page Table of Contents Section Routine Maintenance Section Important InformationSafety Precautions What to do if YOU Smell GASPage Section Specifications ML-79 WET Wash Component Identification Illus. No DescriptionInstallation Procedures Location RequirementsUnpacking and Setting UP Leveling DryerDryer Enclosure Requirements Make UP AIR Requirements Page Exhaust Requirements Page Page Be centered within this opening Electrical Information Electrical RequirementsElectrical Service Specifications GroundingElectrical Connections GAS Information Technical GAS DataS. Drill Material Size equivalent are as follows Page Page AIR Information Preparation for Operation and START-UP Preoperational Tests Gas DryersPreoperational Instructions Shut Down InstructionsService and Parts Information ServiceParts Warranty Information Returning Warranty CardsPage Routine Maintenance CleaningDays Section Microprocessor Computer Models GAS Models Electric Models Low or inconsistent gas pressure Electric DryersPage Page Technical Information Data LabelProcedure for Functional Check Replacement Components Page Aquatex Humidity Sensor Instructions Figure #1ADC 07/29/99-25 12/08/00-10