American Dryer Corp ML-79 manual Procedure for Functional Check Replacement Components

Page 46

SECTION IX

PROCEDURE FOR FUNCTIONAL CHECK OF

REPLACEMENT COMPONENTS

1.Microprocessor (computer) Board

a.Upon completing installation of the replacement microprocessor (computer) board, reestablish power to the dryer.

b.Start the drying cycle.

c.Verify that the motors and the heat indicator dots, in the microprocessor (computer) L.E.D. display are on. (Refer to the illustration below).

d.Verify that the motors heat, and door indicator lights on the back side of the microprocessor (computer) board are lit.

42

Image 46
Contents What do YOU do if YOU Smell GAS QUE Faire SI Vous Sentez UNE Odeur DE GAZFor Your Safety Pour Votre Sécurité Retain This Manual In a Safe Place For Future ReferenceFor Your Safety Page Table of Contents Section Routine Maintenance Section Important InformationSafety Precautions What to do if YOU Smell GASPage Section Specifications ML-79 WET Wash Component Identification Illus. No DescriptionInstallation Procedures Location RequirementsUnpacking and Setting UP Leveling DryerDryer Enclosure Requirements Make UP AIR Requirements Page Exhaust Requirements Page Page Be centered within this opening Electrical Information Electrical RequirementsElectrical Service Specifications GroundingElectrical Connections GAS Information Technical GAS DataS. Drill Material Size equivalent are as follows Page Page AIR Information Preparation for Operation and START-UP Preoperational Tests Gas DryersPreoperational Instructions Shut Down InstructionsService Service and Parts InformationParts Warranty Information Returning Warranty CardsPage Routine Maintenance CleaningDays Section Microprocessor Computer Models GAS Models Electric Models Low or inconsistent gas pressure Electric DryersPage Page Technical Information Data LabelProcedure for Functional Check Replacement Components Page Aquatex Humidity Sensor Instructions Figure #1ADC 07/29/99-25 12/08/00-10