▲! WARNING
Proposition 65
Use of this product could expose you to substances
from fuel combustion that contain chemicals known to the State of California to cause cancer, birth defects and other reproductive harm.
IMPORTANT
You must disconnect and lockout the electric supply and the gas supply or the steam supply before any covers or guards are removed from the machine to allow access for cleaning, adjusting, installation, or testing of any equipment per OSHA standards.
Please observe all safety precautions displayed on the equipment and/or specified in the installation manual included with the dryer.
Dryer must be installed in a location/environment, which the ambient temperature remains between 40° F (4.44° C) and 130° F (54.44° C).
“Caution: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper operation.”
«Attention: Au moment de l’entretien des commandes, étiquetez tous les fils avant de les débrancher. Des erreurs de câblage peuvent entraîner un fonctionnement inadéquat et dangereux.»
CAUTION
Dryers should never be left unattended while in operation.
WARNING
Children should not be allowed to play on or near the dryer(s).
Children should be supervised if near dryers in operation.
Under no circumstances should the dryer door switch, lint drawer switch, heat safety circuits ever be disabled.
The dryer must never be operated with any of the back guards, outer tops, or service panels removed. Personal injury or fire could result.
Dryer must never be operated without the lint filter/ screen in place, even if an external lint collection system is used.
FOR YOUR SAFETY
Do not dry mop heads in the dryer. Do not use dryer in the presence of dry cleaning fumes.
Dryer must not be installed or stored in an area where it will be exposed to water or weather.
The wiring diagram for the dryer is located in the front electrical control box area.
Table of Contents ________ | ||
Safety Precautions | 4 | |
6 | ||
8 | ||
Installation Procedures | 10 | |
Location Requirements | 10 | |
Unpacking/Setting Up | 10 | |
Dryer Enclosure Requirements | 11 | |
Fresh Air Supply Requirements | 12 | |
Exhaust Requirements | 12 | |
Electrical Information | 14 | |
Gas Information | 16 | |
Steam Information | 18 | |
Preparation for Operation | 20 | |
Preoperational Test | 20 | |
Shutdown Instructions | 21 | |
Operating Instructions | 21 | |
Service/Parts Information | 22 | |
Service | 22 | |
Parts | .......................................................................... | 22 |
Warranty Information | 22 | |
Returning Warranty Cards | 22 | |
Warranty | 22 | |
Returning Warranty Parts | 22 | |
Routine Maintenance | 23 | |
Cleaning | 23 | |
Adjustments | 24 | |
Lubrication | 24 | |
Data Label Information | 24 | |
Reversing Timer Spin/Dwell Adjustments | 24 | |
Procedure for Functional Check |
| |
of Replacement Components | 25 | |
Manual Reset Burner | 26 | |
Phase 7 | 26 | |
Dual Timer | 26 | |
Fire Suppression System | 26 | |
List of Acronyms _____________________ | ||
D.M.S. | Drill Measurement Size |
|
DSI | Direct Spark Ignition |
|
F.S.S. | Fire Suppression System |
|
HSI | Hot Surface Ignition |
|
HVAC | Heating, Ventilating, and |
|
in wc | Inches of Water Column |
|
L.E.D. | Light Emitting Diode |
|
L.P. | Liquid Propane |
|
OSHA | Occupational Safety and Health Administration | |
R.M.A. | Return Material Authorization |
|
113335 - 12 | www.amdry.com | 3 |