(a)To check and/or set the 1/8” (3.175 mm) GAP, use a Direct Spark Ignition (DSI) GAP Feeler Gauge or similar device to determine GAP size. DO NOT USE FEELER TO SET THE GAP, USE IT ONLY TO DETERMINE THE SIZE OF THE GAP. If an adjustment is necessary, bend the ground rod to achieve the correct GAP, then recheck the 1/8” (3.175 mm) GAP with a feeler gauge.

(b)The ALIGNMENT of the Ignitor/Flame-Probe Assembly in relation to the GAP on the ignitor electrode and ground rod must be maintained in as vertical (straight line) a position as possible (refer to the illustration below) otherwise the DSI module will indicate a system malfunction and go into the “LOCKOUT” mode (the light emitting diode [L.E.D.] indicator will LIGHT “RED” CONTINUOUSLY).

(c)The POSITIONING of the Ignitor/Flame-Probe Assembly is extremely important because it provides the necessary feedback information to the DSI module. The flame- probe electrode must be POSITIONED 1/4” (6.35 mm) minimum into the flame path (refer to the illustration below) and must be POSITIONED 1-inch (2.54 cm) maximum from the burner tube (refer to the illustration below) otherwise the DSI module will indicate a system malfunction and go into the “LOCKOUT” mode (the L.E.D. indicator will LIGHT “RED” CONTINUOUSLY).

NOTE: To reset the DSI module if it is in the “LOCKOUT” mode, “Burner Control Fault” will display. To clear this fault code press the “CLEAR/STOP” key.

3 7

Image 41
Contents ML-310 Phase Important Note to Purchaser Retain This Manual In a Safe Place For Future ReferenceFor Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement ML-310 Reference Guide Base Section Explosion could Result SectionStandards Liquids CleaningAT 80 PSI 5.51 Bars Every 3 Months LubricationDays After Installation and Every 6 Months Thereafter AdjustmentsSpecifications and Dimensions Dimensions Obligation Obligation ENCLOSURE/AIR SUPPLY/EXHAUST Requirements Installation RequirementsElectrical and GAS Requirements Operational Service Check ProcedureDirect Spark Ignition DSI System COMPONENTS/FUNCTIONS Heat SectionVAC Direct Spark Ignition DSI Modules Valves are not Field Repairable First Visual Check Second Visual Check Third Visual Check DSI Ignitor GAP Feeler Gauge Troubleshooting the Direct Spark Ignition DSI SystemPage Page Page First Visual Check Second Visual Check Third Visual Check With a Flame GAP on the Ignitor/Flame-Probe Page Flash Green Continuously Page With a Flame GAP on the Ignitor/Flame-Probe Page Light RED Continuously Page Made of Brass and can be Easily Damaged CreateapotentialsafetyhazardGeneral Overview Steam Coil System OperationPage Page Page Page Sprinkler System Description MAN3488 Page Supplies Before Servicing the Dryer Page Page Tilting System Description Page Page Page Page Page AIR JET Assembly Page Blower Squirrel Cage Fan Motor Assembly Page Page Important do not Overtighten V-BELTS Important do not Overtighten V-BELTS Page Page Regulator Operation FILTER/REGULATOR AssemblyDoor Systems Manual Doors Automatic Doors Page Page Page Control and Electrical System Ladder Diagram Page Button does not Disable the High Voltage to the Dryer Page ºC + ºC + ºK Page Page Page Page Page Page Tumbler/Drum SECTION. Serious Injury can Result Page Basket Tumbler Drive System Important do not Overtighten Turnbuckle Important do not Overtighten Turnbuckle Page Page Important do not Overtighten Turnbuckle Page Page Page Phase 7 OPL System Diagnostics Inputs RED Outputs Green Fdrc RED L.E.D Lint RED L.E.D 100 101 Troubleshooting Drive motor is not operating does not start Impellor fan motor is not operating does not start 105 106 Dryer operates but is taking too long to dry Excessive noise and vibration 109 Procedure for Functional Check Replacement Components 111 ADC450421 1- 10/03/00-10