Chapter 2 Switch Module Installation
Installing the Switch Module
Step 7 Slide the switch module into the bay until it stops (Figure
Figure 2-2 Installing the Switch Module
C |
|
O |
|
N |
|
S |
|
O |
|
L M |
|
EO | ! |
D | |
E | M |
BM
R S T
LNK 15 ACT
LNK 16 ACT
LNK 17 ACT
LNK 18 ACT
1 | STACK | 2 |
|
201897
Step 8 Move the switch module release latch to the closed position. After you insert and lock the switch module, it turns on, and the
The system power LED blinks green while POST is running and then turns solid green when POST is finished.
Step 9 Confirm that the switch module system power LED is green. See the “Switch Module LEDs” section on page
Step 10 Replace the
To remove the switch module, reverse the installation procedure. Place either another switch module or a filler module in the blade enclosure bay within 1 minute of removal.
After Installing the Switch Module
After the switch module is installed, you might need to:
•Configure the switch module with the initial configuration. For instructions, see the switch module getting started guide on the documentation CD and also on Cisco.com.
•Connect the StackWise Plus cables to create a switch stack. See the “Creating Switch Stacks” section on page
•Connect to the
Catalyst Switch Module 3110G, 3110X, and 3012 for IBM BladeCenter Hardware Installation Guide
|
| ||
|
|