Graco A-25 important safety instructions Supply Wet-Cups with Throat Seal Liquid

Page 23

Initial Startup

Supply Wet-Cups with Throat

Seal Liquid

Pump rod and connecting rod move during operation. Moving parts can cause serious injury such as pinching or amputation. Keep hands and fingers away from wet-cup during operation. Close main air valve before filling wet-cup.

1.Component A (ISO) Pump: Keep reservoir (Z) 3/4 filled with TSL. Wet-cup piston circulates TSL through wet-cup to carry away isocyanate film on displacement rod. Change the fluid in the reservoir when it becomes milky-looking.

2.Component B (Resin) Pump: Check felt washers in packing nut/wet-cup (AK) daily. Keep saturated with TSL to prevent material from hardening on dis- placement rod. Replace felt washers when worn or contaminated with hardened material.

AK

Z

ti16974a

3A1569B

23

Image 23
Contents Operation Contents Proportioner Heated Hose Gun Proportioner ModelsSystems Related ManualsElectric Shock Hazard Fire and Explosion Hazard Equipment Misuse Hazard Important Two-Component Material Information Changing Materials Typical Installation, without Circulation Key for FIG Typical Installation, without CirculationTypical Installation, with Circulation Typical Installation, with CirculationComponent Identification IG Typical InstallationMain Air Filter Filters system air supply Control Panel Temperature Controls and IndicatorsSee Tempera- ture Controls and Indicators Size Component Main Power SwitchLocate Reactor A-25 Electrical Requirements SetupDetermine Power Source Step One Connect Electrical Cord Configure to Supply PowerTerminal Blocks WattsHeater Jumpers Air Supply Connection Iso Pump Lubrication System SetupGround System Fluid Supply Connections Connect Heated Hose Install Fluid Temperature Sensor FTSRecirculation / Pressure Relief Lines Fusion AP Gun shown Pressure Check Hose Initial StartupLoad Fluid with Feed Pumps Manual current control mode only Set TemperaturesSupply Wet-Cups with Throat Seal Liquid Closed SprayingSB SA Spray AdjustmentsOpen Close Pressure Relief ProcedurePark ShutdownFlushing Operation Daily Start-up ProcedureOpen gun fluid manifold valves a and B Circulation Through Reactor Fluid CirculationCirculation Kit CK Part Gun Manual Circulation Through Gun ManifoldSetup Mode DataTrak Controls and IndicatorsRun Mode DataTrak Operation Setup ModeRun Mode See DataTrak Diagnostic CodesMaintenance Symbol Code Code Name Diagnosis Cause Diagnostic CodesTemperature Control Diagnostic Codes DataTrak Diagnostic CodesWith Wheels Without Wheels Dimension In. mm DimensionsCategory Data Technical DataGraco Information Graco Standard Warranty
Related manuals
Manual 56 pages 23.25 Kb