Circulation Through Gun Manifold
Do not circulate fluid containing a blowing agent without consulting with your material supplier regarding fluid temperature limits.
Circulating fluid through the gun manifold allows rapid preheating of hose.
1.Install gun fluid manifold (P) on accessory circula- tion kit (CK). Connect high pressure circulation lines
(R) to circulation manifold.
Fluid Circulation
5. Set temperature targets, see page 22. Turn on
A , B , and | heat zones by pressing |
.
6. Press to display actual temperatures.
7. Turn the air regulator to a low pressure until A
and B temperatures reach targets. Increase the pressure once the temperatures are on target.
P
CKR
ti2767a
The Fusion AP gun manifold is shown.
Table 1: Circulation Kit (CK)
Part | Gun | Manual |
|
|
|
246362 | Fusion AP | 309818 |
256566 | Fusion CS | 313058 |
GC1703 | Probler P2 | 313213 |
2.Route circulation lines back to respective compo- nent A or B supply drum. Use hoses rated at the maximum working pressure of this equipment. See manual for installation instructions.
3.Follow Initial Startup, page 21.
4. Turn main power ON |
| . |
|
|
|
3A1569B | 31 |