Majestic Appliances LDVR1 installation instructions Rear Wall Installation Twist Lock Pipe, Step

Page 14

LDVR Series Direct Vent Gas Fireplace

20"

(508mm)

 

Top View

 

Straight Venting

20"

20"

(508mm)

(508mm)

Max.

Max.

45°

45°

Top View

Rear Vent Corner Installation

Fig. 14 Rear vent applications, one 45° elbow.

Rear Wall Installation

Twist Lock Pipe

STEP 1

Locate vent opening on the wall. To locate hole center consult with appropriate fireplace dimensions, Page 4. Frame as shown below.

NOTE: When using flex vent, the opening will have to be measured according to the 1/2” (13 mm) rise in 12” (305 mm) vertical run.

Combustible Walls (Fig. 15): Cut a 10³⁄”H x 9³⁄” W (264 x 240 mm) hole through the exterior wall and frame as shown.

Noncombustible Walls (Fig. 15): Hole opening must be 7¹⁄” (190mm) in diameter.

STEP 2

Measure wall thickness and cut zero clearance sleeve parts to proper length (MAXIMUM 12”/305 mm). As- semble sleeve and attach to firestop with #8 sheet metal screws (supplied). (Fig. 16)

Vent Opening for Combustible Wall

9³⁄

(240mm)

Framing

10³⁄Detail (264mm)

Fireplace Hearth

Opening for Noncombustible Wall

7¹⁄

(190mm)

VO584-100

Fig. 15 Locate vent opening on wall.

Adjustable

Max. Length

Zero Clearance

12” (305mm)

 

Sleeve

 

 

#8 Screws (2)

#8 Screws

 

(2)

#8

 

Screws

 

(2)

Firestop

 

Adjustable Zero Clearance Sleeve

ZCS101

Fig. 16 Adjustable zero clearance sleeve.

STEP 3

Measure from the fireplace collar or elbow face to face of outside wall (add 2” for vent pipe overlap). Mark pipes and cut to length. It is very important that the two pipes are flush with the outside wall once the fireplace is in its final location. (Fig. 17)

STEP 4

Slip 4” and 7” pipes onto respective flue collars. Make sure to fix to the fireplace collar the 4” pipe with three

(3)screws before fixing the 7” pipe on the 7” collar. Both pipes must be on a level plane. (Fig 18)

STEP 5

Guide the vent termination 4” collar into the 4” pipe then the 7” collar into the 7” pipe. Do not force the venting into position. If the pipes do not line up with the termi- nation collars, disassemble pipes and reattach to the fireplace collar. (Fig. 18)

STEP 6

Secure fireplace to floor through floor holes and adjust- able frame drywall strip (nailing flange) to frame. (Refer to Framing & Finishing Section).

14

10007317

Image 14
Contents Builder Rear Vent Direct Vent Table of Contents Ansi Z21.88-2005 / CSA Vented Gas Fireplace Heaters Installation & Operating Instructions33LDVR / 36LDVR / 39LDVR / 43LDVR Certified To Requirements for the Commonwealth of Massachusetts Gas Equipment Venting System not ProvidedFireplace Dimensions Framing DimensionsClearance to Combustibles Mantel ChartLocating Your Fireplace MantelsFinal Finishing HearthFraming and Finishing Gas SpecificationsAlternate Switch Location Gas Line InstallationRemote ON/OFF Switch InstallationEB-1 Electrical Box Electronic Gas Control ValveGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationGeneral Information Assembling Vent Pipes Canadian InstallationsUSA Installations Flex Vent PipesRear Wall Venting Applications How to Use the Vent GraphTwist Lock Pipes Example aRear Wall Installation Twist Lock Pipe StepVertical Sidewall Applications Rear Wall Vent Installations Flex Vent PipeStep Maximum number of 90 elbows is three Vertical Sidewall Installation Zero clearance sleeve is only required for combustible wallsBelow Grade Installations Measure horizontal length including 2 overlapVertical Through-the-Roof Applications This Gas Fireplace has been approved forVertical Through-the-Roof Installation Typical vertical roof applicationsMin 610 mm Venting Components Operating Instructions Glass CleaningWindow Frame Assembly Removal Glass InformationLog Installation Installation of Logs, Lava Rock & Ember MaterialLog Identification Chart Rial on the burner housing assembly Do not place any of the lava rock mateOn the burner housing assembly Flame CharacteristicsFlame & Temperature Adjustment Do not place any of the lava rock material33LDVR Lighting and Operating Instructions To Turn Off Gas To HeaterValve in the on position Lighting InstructionsTurning Off the Gas to the Appliance Troubleshooting Honeywell Millivolt Valve Troubleshooting the Gas Control System Normal Operation Abnormal OperationSIT 820 Nova Gas Control Valve Fig Fuel Conversion InstructionsPSE Pilot SIT top Convertible PilotBurner and Burner Compartment MaintenanceCleaning the Standing Pilot Control System Brass Trim33/36/39/43LDVR Ldvr DescriptionFuel Conversion Kits Fan Kits Optional Accessories AvailableFK24 Fan Assembly Ceramic Refractory Panels Wiring InstructionsRemote Controls Model Function/s ControlledScreen Door Kit Optional Trim KitsLouvre Accent Trim Filigree Louvre KitLdvr Series Direct Vent Gas Fireplace Ldvr Series Direct Vent Gas Fireplace Ldvr Series Direct Vent Gas Fireplace Limited Lifetime Warranty Efficiency Ratings AFUE%