Vertical Sidewall Installation
STEP 1
Locate vent opening on the wall. It may be necessary to first position the fireplace and measure to obtain hole location. Depending on whether the wall is combustible or noncombustible, cut opening to size. (Fig. 25)
For combustible walls first frame in opening.
Combustible Walls (Fig. 25): Cut a 9³⁄₈”H x 9³⁄₈” W (240 x 240 mm) hole through the exterior wall and frame.
Noncombustible Walls (Fig. 25): Hole opening must be 7.5” (190 mm) in diameter.
Vent Opening for Combustible Wall
9³⁄₈”
(240mm)
9³⁄₈”
(240mm)
Framing Detail
Fireplace Hearth
Opening for Noncombustible Wall
7¹⁄₂”
(190mm)
Fig. 25 Locate vent opening on wall.
STEP 2
Measure wall thickness and cut adjustable zero clearance sleeve parts to proper length (MAXIMUM 12”/305 mm). (Fig. 26) Adjust sleeve to minimum (9³⁄₈” x 9³⁄₈” and attach to firestop with #8 sheet metal screws (supplied). As- semble sleeve and attach to firestop with #8 sheet metal screws (supplied). Install firestop assembly.
Zero clearance sleeve is only required for combustible walls.
STEP 3
Attach the appropriate venting component(s) to the inner and outer flue collars of the fireplace using three
(3)screws. (Fig. 27) Follow with the installation of the inner and outer elbow. Again secure joints with three (3) sheet metal screws.
LDVR Series Direct Vent Gas Fireplace
Adjustable Zero Clear- | Maximum Length | ||
ance Sleeve |
| ||
| 12” (305mm) | ||
|
| ||
|
| #8 Screws (2) | |
#8 Screws |
|
| |
(2) |
| Adjust- | |
|
| ||
|
| able Zero | |
| #8 Screws (2) | Clearance | |
Wall Exterior | Sleeve | ||
| |||
|
| ||
Wood Framing |
| Firestop | |
Zero Clearance | |||
Firestop | |||
Sleeve Flush with | |||
| |||
| Wall Exterior |
Vent Pipe
Drywall
CFM135
Fig. 26 Locate vent opening on wall.
Ensure Pipes are
Concentric
�
��������
CFM143
Fig. 27 Apply sealant to inner and outer pipe.
STEP 4
Measure the horizontal length requirement including a 2” (51 mm) overlap, i.e. from the elbow to the outside wall finish plus 2”, or the distance required if installing a second 90° elbow. (Fig. 28)
STEP 5
Use appropriate length of pipe section - telescopic or fixed - and install the horizontal vent sections. The 20” (508 mm) section of pipe which goes through the wall is packaged with the 7TDVSK starter kit, and can be cut to suit if necessary. (Fig. 29)
Sealing vent pipe and firestop gaps with high temperature sealant will restrict cold air being drawn in around fireplace.
10007317 | 17 |