Majestic Appliances LDVR1 installation instructions Troubleshooting the Gas Control System

Page 31

LDVR Series Direct Vent Gas Fireplace

Troubleshooting the Gas Control System

SIT 822 Valve with Synetek Electronic Control

Operating Diagram

Normal Operation

Abnormal Operation

ON/OFF Switch Closed?

YES

Safe Start Check On?

YES

0 Sec Purge

Ignition Trial: 30 sec Spark ON Pilot Valve ON. Has Flame been Detected within 30 sec?

Spark Off. Main Valve ON.

Pilot Flame Continuously

Monitored

Pilot Flame Sense OK?

ON/OFF Switch Opened?

YES

Pilot and Main Valve OFF?

YES

NO

NO

NO

5 sec Inter-Trial Delay

LED: Steady Flash?

Lockout: Flame detected out of sequence Reset by interrupting ON/OFF switch or power for 10 sec

LED: 5 Flashes?

Reverse power cord polarity

LED: 2 Flashes?

Reset by interrupting ON/OFF switch for power for 10 sec

YES

Pilot, Valve OFF, Spark OFF

Have three ignition trials been completed? NO

LED: 3 Flashes?

Lockout: Flame Loss

Reset by interrupting ON/OFF switch or power for 10 sec

YES

Main Valve OFF, Spark ON

 

 

Has flame been detected within 30 sec?

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

 

 

 

 

 

 

 

 

 

 

Have three pilot flame losses been

 

YES

 

 

detected?

 

 

 

 

 

 

 

 

 

 

 

0 sec Post Purge?

Heating Cycle Complete LED:

OFF

10007317

31

Image 31
Contents Builder Rear Vent Direct Vent Table of Contents 33LDVR / 36LDVR / 39LDVR / 43LDVR Certified To Installation & Operating InstructionsAnsi Z21.88-2005 / CSA Vented Gas Fireplace Heaters Gas Equipment Venting System not Provided Requirements for the Commonwealth of MassachusettsFraming Dimensions Fireplace DimensionsMantels Mantel ChartLocating Your Fireplace Clearance to CombustiblesGas Specifications HearthFraming and Finishing Final FinishingInstallation Gas Line InstallationRemote ON/OFF Switch Alternate Switch LocationElectronic Gas Control Valve EB-1 Electrical BoxLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2Flex Vent Pipes Canadian InstallationsUSA Installations General Information Assembling Vent PipesExample a How to Use the Vent GraphTwist Lock Pipes Rear Wall Venting ApplicationsStep Rear Wall Installation Twist Lock PipeStep Rear Wall Vent Installations Flex Vent PipeVertical Sidewall Applications Maximum number of 90 elbows is three Zero clearance sleeve is only required for combustible walls Vertical Sidewall InstallationMeasure horizontal length including 2 overlap Below Grade InstallationsThis Gas Fireplace has been approved for Vertical Through-the-Roof ApplicationsTypical vertical roof applications Vertical Through-the-Roof InstallationMin 610 mm Venting Components Glass Information Glass CleaningWindow Frame Assembly Removal Operating InstructionsLog Identification Chart Installation of Logs, Lava Rock & Ember MaterialLog Installation Do not place any of the lava rock mate Rial on the burner housing assemblyDo not place any of the lava rock material Flame CharacteristicsFlame & Temperature Adjustment On the burner housing assembly33LDVR To Turn Off Gas To Heater Lighting and Operating InstructionsTurning Off the Gas to the Appliance Lighting InstructionsValve in the on position Troubleshooting Honeywell Millivolt Valve Normal Operation Abnormal Operation Troubleshooting the Gas Control SystemSIT top Convertible Pilot Fuel Conversion InstructionsPSE Pilot SIT 820 Nova Gas Control Valve FigBrass Trim MaintenanceCleaning the Standing Pilot Control System Burner and Burner Compartment33/36/39/43LDVR Description LdvrFuel Conversion Kits FK24 Fan Assembly Optional Accessories AvailableFan Kits Model Function/s Controlled Wiring InstructionsRemote Controls Ceramic Refractory PanelsFiligree Louvre Kit Optional Trim KitsLouvre Accent Trim Screen Door KitLdvr Series Direct Vent Gas Fireplace Ldvr Series Direct Vent Gas Fireplace Ldvr Series Direct Vent Gas Fireplace Limited Lifetime Warranty AFUE% Efficiency Ratings