Napoleon Fireplaces B36DFP Installation Wall and Ceiling Protection, Horizontal Installation

Page 14
FIGURE 17

14

INSTALLATION

WALL AND CEILING PROTECTION

FOR SAFEAND PROPER OPERATION OF THE FIREPLACE, FOLLOW THE VENTING INSTRUCTIONS EXACTLY.

NOTE: Only a clearance to combustibles of 2" at the top of the vent pipe is required and 1" at the bottom and sides.

HORIZONTAL INSTALLATION

This application occurs when vent ing through an exterior wall. Having determined the air terminal location, cut and frame a hole in an exterior wall with a minimum opening as required. See Note above. (As an alternative to framing, a vent pipe shield may be installed, ensuring a 1" clearance to combustibles.

FIGURE 14

1.Mark and cut the vent pipe shield to the determined depth of the combustible wall. Apply a bead of caulking (not supplied) to the framework or to the shield plate (in the case of a finished wall) and secure the shield through the opening to the interior wall. The final location of the vent pipe shield should maintain the required clearance to the 8" vent pipe / liner. (See note above). Do not fill this cavity with any type of material. Apply a bead of caulking all around and place a firestop spacer over the vent shield to restrict cold air from being drawn into the room or around the fire- place. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its final position, apply sealant between the pipe / liner and the firestop spacer.

OR

FIGURE 15

VERTICAL INSTALLATION

This application occurs

FIGURE 16

when venting through a

 

roof. Installation kits for

 

various roof pitches are

 

available from your Napo-

 

leon dealer. See Accesso-

 

ries to order the specific

 

kit required.

 

1. Determine the air terminal location, cut and frame 10 inch openings in the ceiling and the roof to provide the minimum 1 inch clearance between the fireplace pipe / liner and any combustible material. Try to center the ex- haust pipe location midway between two joist to prevent having to cut them. Use a plumb bob to line up the center of the openings. DO NOT FILL THIS SPACE WITH ANY TYPE OF MATERIAL. A vent pipe shield will prevent any materials such as insulation, from filling up the 1" air space around the pipe. Nail headers

between the joist for extra support.

2. Apply a bead of caulking (not sup- plied) to the frame- work or to the Wolf Steel vent pipe shield

plate or equivalent (in the case of a finished ceiling), and secure over the opening in the ceiling. A firestop must be placed on the bottom of each framed opening in a roof or ceiling that the venting system passes through. Apply a bead of caulking all around and place a firestop spacer over the vent shield to restrict cold air from being drawn into the room or around the fireplace. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its final position, apply sealant between the pipe / liner and the firestop spacer.

W415-0484 / A / 07.26.06

Image 14
Contents W415-0484 / a What to do if YOU Smell GAS Table of Contents Conditions and Limitations Care of GLASS, and Plated Parts General InstructionsGeneral Information Venting Venting LengthsAIR Terminal Locations Typical Vent Installations Special Vent InstallationsVenting Application Flow Chart Horizontal Termination VerticalDefinitions When HT VTHorizontal Termination Elbow Vent Length ValuesWhen H T V T Simple venting configuration only one 45º and 90 elbowVertical Termination Formula 1 HT 3VT Formula 2 HT + VT 40 feet Example Vertical Installation Installation Wall and Ceiling ProtectionHorizontal Installation Using Flexible Vent Components Horizontal AIR Terminal InstallationGAS Installation Restricting Vertical VentsConversion Kits Mobile Home InstallationFraming Nailing TAB Installation Mantle InstallationDoor Removal & Installation L36 Louvre Installation FinishingCharcoal Embers LOG PlacementLogo Placement Glowing EmbersOptional Blower Installation Qualified StallerOptional FAN Installation GD36 Thermostatic Sensor ControlOperating Instructions Operation / MaintenanceMaintenance Not use any phone in your buildingVenturi Adjustment AdjustmentsPilot Burner Adjustment Replacements Common Replacement PartsCattena Utio Hchaud Trouble Shooting Guide Symptom Problem Test SolutionAfter Taking Pressure READINGS, be Sure to Turn Fireplace Service History W415-0484 / a