Napoleon Fireplaces B36DFP, B36DFN manual Nailing TAB Installation, Mantle Installation

Page 18

18

NAILING TAB INSTALLATION

1)Attach the nailing tabs to the corner posts using the 2 sheet metal screws supplied. Secure through the centre of the top and bottom slots in the nailing tab and then through the existing holes in the corner posts.

If there are no existing holes, follow

NAILING

TAB

these instructions:

 

Position the nailing tab so that the front

 

face is offset with the front edge of the

 

corner post (approx. ½"). Centre the

 

nailing tab vertically on the corner post.

 

Figure 32 a.

 

Drill through the centre of the top and bottom slots in the nailing tab. Secure using the two sheet metal screws sup- plied. This allows the nailing tab to slide back and forth for desired framing. Figure 32b.

2)To determine the final location of the nailing tab you must first determine the thickness of your finishing mate- rial (i.e. drywall). This will determine the dimension from the front edge of the corner post to the nailing tab. Once the nailing tab is in the desired location, drill through the centre hole of the nailing tab. Secure with a sheet metal screw*. Figure 32c.

*Additional set screws may be installed.

MANTLE INSTALLATION

Combustible mantle clearance can vary according to the mantle depth. Use the graph to help evaluate the clear- ance needed. Curtains, above the fireplace, must not be positioned lower than the 8" distance required for the 2" combustible mantle. These same requirements apply to any combustibles protruding on either side of the fireplace.

FIGURES 32a-c

CORNER

POST

NAILING

TAB

TOP SLOT

A

FINISHING

MATERIAL

B

FIGURES33•4

CENTRE

HOLE

C

W415-0484 / A / 07.26.06

Image 18
Contents W415-0484 / a What to do if YOU Smell GAS Table of Contents Conditions and Limitations General Instructions General InformationCare of GLASS, and Plated Parts Venting Venting LengthsAIR Terminal Locations Typical Vent Installations Special Vent InstallationsVenting Application Flow Chart Horizontal Termination VerticalDefinitions When HT VTHorizontal Termination Elbow Vent Length ValuesWhen H T V T Simple venting configuration only one 45º and 90 elbowVertical Termination Formula 1 HT 3VT Formula 2 HT + VT 40 feet Example Installation Wall and Ceiling Protection Horizontal InstallationVertical Installation Using Flexible Vent Components Horizontal AIR Terminal InstallationGAS Installation Restricting Vertical VentsMobile Home Installation FramingConversion Kits Nailing TAB Installation Mantle InstallationDoor Removal & Installation L36 Louvre Installation FinishingCharcoal Embers LOG PlacementLogo Placement Glowing EmbersOptional Blower Installation Qualified StallerOptional FAN Installation GD36 Thermostatic Sensor ControlOperating Instructions Operation / MaintenanceMaintenance Not use any phone in your buildingAdjustments Pilot Burner AdjustmentVenturi Adjustment Replacements Common Replacement PartsCattena Utio Hchaud Trouble Shooting Guide Symptom Problem Test SolutionAfter Taking Pressure READINGS, be Sure to Turn Fireplace Service History W415-0484 / a