Desa VDVF36STN/STP, VDVF36PN/PP installation manual Vent Opening Requirements

Page 11

VENTING INSTALLATION

Installation for Horizontal Termination (Cont.)

11

VENTING INSTALLATION

Continued

Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

Flexible vent pipe must be installed with spacer springs every 12". See Figure 16, page 10. All connections must be clamped tightly and sealed with high temperature silicone sealant as speci- fied in the second warning statement on page 9.

3.Attach vent pipe assembly to the fireplace. Set fireplace in front of it’s permanent location to insure minimum clearances. Mark the wall for a 10" square hole (for noncombustible ma- terial such as masonry block or concrete, a 7 1/2" diameter hole is acceptable). See Figure 17. The center of the hole should line up with the center-line of the horizontal rigid vent pipe. Cut a 10"x10" (25.4cm x 25.4cm) square hole through combustible exterior wall (7 1/2" [19.1cm] diameter hole if noncombustible). Frame as necessary (see Figure 17).

4.Noncombustible Exterior Wall: Apply a bead of non-harden- ing mastic around the outside edge of the vent cap. Position the vent cap in the center of the 7 1/2" hole on the exterior wall with the arrow on the vent cap pointing up. Attach the vent cap with four wood screws provided (see Figure 18). Note: Replace the wood screws with appropriate fasteners for stucco, brick, con- crete, or other types of siding.

WARNING: Do not recess vent termination in to any wall. This will cause a fire hazard.

Figure 17 - Vent Opening Requirements

Vent Cap

Wood Screw

Figure 18 - Installing Horizontal Vent Cap (Noncombustible Exterior)

Combustible Exterior Wall: For vinyl siding, stucco, or wood exteriors, a siding standoff must be installed between the vent cap and exterior wall. The siding standoff prevents excessive heat from damaging siding materials. Siding materials must be cut to accommodate standoff. Bolt the vent cap to the stand- off. Apply non-hardening mastic around outside edge of the standoff. Position the standoff/cap assembly in the center of the 10" square hole and attach to exterior wall with wood screws provided (see Figure 19). The siding standoff must sit flush against the exterior fascia material.

5.Combustible Exterior Wall Only: Slide the interior wall firestop over the vent pipe before connecting the horizontal run to the vent cap (see Figure 20).

6.Carefully move the fireplace with vent assembly attached to- ward the wall and insert the vent pipe into the horizontal termi- nation. The pipe overlap should be a minimum of 1 1/4". Fasten all vent pipe connections (except vent cap) with screws pro- vided. Refer to Framing on pages 6 and 7 for instructions on securing unit to framing or floor.

7.Combustible Exterior Wall Only: Slide the wall firestop against the interior wall surface and attach with screws pro- vided (see Figure 20).

Cut Vinyl Siding

Away to Fit Standoff

 

Standoff

 

Wood Screw

 

Vent Cap

 

Bolt

Apply Mastic

 

to All Four Sides

 

Figure 19 - Installing Vinyl Siding Standoff (Combustible

Exterior Wall)

 

 

Interior Wall

 

Surface

 

Interior Wall Firestop

 

(Combustible

 

Exterior Wall Only)

 

Horizontal

 

Vent Pipe

Vent Cap

Screw

(Horizontal

 

Termination)

 

Figure 20 - Connecting Vent Cap with Horizontal Vent Pipe

For morevisit www..com

105706-01B

Image 11
Contents What to do if YOU Smell GAS Check Local Codes Prior to InstallationProduct Dimensions Table of ContentsBack View Glossary of TermsBefore YOU Begin IntroductionSelecting Location Clearances PRE-INSTALLATION PreparationFraming Mantel ClearancesLocation of Vent Termination PRE-INSTALLATION Preparation General VentingGeneral Venting Installation Planning Venting InstallationInstallation Precautions Installing Vent System in a Chase Installation for Horizontal TerminationVent Opening Requirements Horizontal Venting Horizontal Termination ConfigurationsFlat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Cathedral Ceiling InstallationVanguard Rigid Venting High Altitude InstallationParts Lists for Venting Kits and Components Simpson Dura-Vent GS 4 x 6 5/8 InstallationWall Switch Installation Vanguard Flexible VentingInstalling Receiver Optional Wireless HAND-HELD Remote Control InstallationElectrical Hookup for Blower Accessory GAS Line HOOK-UP Installing Battery in Hand-Held Remote Control UnitInstalling LOG SET GAS Supply TestingDecorative Facing Pilot Assembly AdjustmentBurner Removal Burner Flame AdjustmentOperating Guidelines and Maintenance Instructions Operating Fireplace Cleaning MaintenanceTo Turn OFF GAS To Appliance Lighting InstructionsOptional Remote Operation Parts Under Warranty Replacement Parts Service HintsTechnical Service Wiring DiagramObserved Problem Possible Cause Remedy TroubleshootingObserved Problem Possible Cause Company Gas leak. See Warning statement Blower KIT Davdbk Accessories Replacement Parts ListWall Switch KIT Pilot AssemblyScreen Assembly AssemblyDoor Assembly END Glass AssemblyOwners Registration Form Postage Required 105706-01B Warranty Information