Desa VDVF36STN/STP, VDVF36PN/PP installation manual GAS Supply Testing, Installing LOG SET

Page 19

INSTALLATION

Gas Line Hook-Up (Cont.)

Gas Supply Testing

Installing Log Set

19

INSTALLATION

Continued

WARNING: Improper installation, adjustment, al- teration, service, or maintenance can cause injury or property damage. Refer to this manual. For assis- tance or additional information, consult a qualified installer, service agency, or gas supplier.

GAS RATING

TYPE OF GAS

NATURAL

PROPANE/LP

 

 

 

Max. Input Rating:

30,000 Btu/hr

28,000 Btu/hr

 

 

 

Orifice Size (0-4,500 Ft.):

7/64"

#52

 

 

 

Min. Input Rating:

21,000 Btu/hr

20,000 Btu/hr

(When the Valve is in

 

 

the LOW Position)

 

 

 

 

 

* Max. Output Rating:

21,000 Btu/hr

20,000 Btu/hr

 

 

 

Manifold Pressure:

3.5 in. WC

10.0 in. WC

 

 

 

**Min. Supply Pressure:

4.5 in. WC

11.0 in. WC

 

 

 

**Max. Supply Pressure:

10.5 in. WC

13.0 in. WC

 

 

 

*70% Efficiency (flue loss calculation).

*For the purpose of input adjustment.

GAS SUPPLY TESTING

Note: This section is intended as a guide for qualified service technicians installing gas to the appliance.

CAUTION: Do not connect appliance before pres- sure testing gas piping. Damage to the gas valve may result and an unsafe condition may be caused.

The millivolt system with a manual HI/LO applies only to the VDVF36STN/STP and VDVF36PN/PP models. The gas control valve is secured underneath the firebox with two brackets fastened to the firebox bottom. Two pressure taps are provided on the gas control valve for a pressure gauge connection (see Figure 40).

Pilot Gas Line -

Pilot Adjustment Cap Do Not Kink To Pilot

Burner

ON/OFF

 

 

 

 

 

Knob

 

 

P

 

 

 

 

 

ILOT

 

 

 

N

 

16AI

 

 

 

O

 

 

 

O

T

 

 

TH

 

 

 

7

 

I

 

 

L

 

 

 

 

P

L

I

 

 

 

 

 

 

 

FFO

O

H

TP

 

 

E A

 

 

TPTH

To Main Burner

 

 

 

 

Inlet Pressure

Outlet

Flame Adjustment Knob

 

Pressure

 

Figure 40 - Millivolt Control Valve

INSTALLING LOG SET

Before proceeding, make sure the gas control valve is in the “OFF” position. Logs have been packaged separately to prevent damage to glass or refractory.

1.Remove top and bottom louvers by simultaneously pulling both top end spring latches towards the center of the appliance until they are disengaged from locating holes. Repeat for bottom end spring latches and pull outward. Reverse procedure to install louvers back.

2.Remove the screen rod by sliding spring clip on one end to- ward the center. Slide rod into screen rod hole until other end of rod is free. Remove rod.

3.To open the glass door, open the pairs of latches located on the top and bottom of the firebox (see Figure 41). Note: Use cau- tion when opening these latches.

4.Carefully open the door. The glass door is mounted to the fire- box with 5 screws.

5.To remove the logs from the shrink wrap, carefully cut the plastic around the perimeter of the log. Do not try to remove the logs from the package without first cutting the plastic.

6.Figure 42 shows the log set. Logs “A” have the knot at the end of the log. Logs “B” have the knot at the middle of the log. Twigs “C” have the shape of a “Y”. Twigs “D” have the shape of bent twigs. Twig “E” is a straight twig which is placed across the top of Logs “B”.

Open

Close

Figure 41 - Opening Door Latches

D

B

C

 

 

 

 

A

 

EA

C

D

B

Figure 42 - Log Set (9 Pieces)

For morevisit www..com

105706-01B

Image 19
Contents What to do if YOU Smell GAS Check Local Codes Prior to InstallationProduct Dimensions Table of ContentsBack View Glossary of TermsSelecting Location IntroductionBefore YOU Begin Clearances PRE-INSTALLATION PreparationFraming Mantel ClearancesLocation of Vent Termination PRE-INSTALLATION Preparation General VentingGeneral Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a Chase Installation for Horizontal TerminationVent Opening Requirements Horizontal Venting Horizontal Termination ConfigurationsFlat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Cathedral Ceiling InstallationParts Lists for Venting Kits and Components High Altitude InstallationVanguard Rigid Venting Simpson Dura-Vent GS 4 x 6 5/8 InstallationWall Switch Installation Vanguard Flexible VentingElectrical Hookup for Blower Accessory Optional Wireless HAND-HELD Remote Control InstallationInstalling Receiver GAS Line HOOK-UP Installing Battery in Hand-Held Remote Control UnitInstalling LOG SET GAS Supply TestingDecorative Facing Pilot Assembly AdjustmentOperating Guidelines and Maintenance Instructions Burner Flame AdjustmentBurner Removal Operating Fireplace Cleaning MaintenanceOptional Remote Operation Lighting InstructionsTo Turn OFF GAS To Appliance Parts Under Warranty Replacement Parts Service HintsTechnical Service Wiring DiagramObserved Problem Possible Cause Remedy TroubleshootingObserved Problem Possible Cause Company Gas leak. See Warning statement Blower KIT Davdbk Accessories Replacement Parts ListWall Switch KIT Pilot AssemblyScreen Assembly AssemblyDoor Assembly END Glass AssemblyOwners Registration Form Postage Required 105706-01B Warranty Information