Desa VDVF36PN/PP, VDVF36STN/STP Horizontal Termination Configurations, Horizontal Venting

Page 12

12

VENTING INSTALLATION

Installation for Horizontal Termination (Cont.)

VENTING INSTALLATION

Continued

Horizontal Termination Configurations

Figures 21 through 23 show different configurations for venting with horizontal termination. Each figure includes a chart with vertical minimum/maximum and horizontal maximum dimensions which must be met. All connections must be sealed with high temperature silicone sealant as specified in the second warning statement on page 9. All horizontal terminations require 1/4" rise per 12" of horizontal run.

FGFVK Vent Kit Shown

Note: The 30° Starter Elbow Must Be Discarded and Replaced with a 45° Starter Elbow.

Horizontal Venting

Vertical (V)

Horizontal (H)

49.5" min.

15" max.

(45° elbow, 1' vertical pipe, 90° elbow)

61.5" min.

34" max.

73.5" min.

58" max.

85.5" min.

10' max.

102.5" min.

20' max.

45° Starter

 

Elbow Required

 

Horizontal Venting

See information in Figure 21 for Vertical(V) and Horizontal(H) maximums and minimums. The same amounts apply for flexible venting.

Figure 22 - Horizontal Termination Using Flexible Venting

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

4' max.

6' min.

8' max.

7' min.

10' max.

8' min.

15' max.

20' max.

20' max.

Figure 21 - Horizontal Termination Configuration for Rigid

Venting Using One 90° Elbow

45° Starter

Elbow

Required

Figure 23 - Horizontal Termination Configuration for Rigid

Venting Using Two 90° Elbows with Termination at 90° with

Fireplace

For..com

105706-01B

Image 12
Contents Check Local Codes Prior to Installation What to do if YOU Smell GASTable of Contents Product DimensionsGlossary of Terms Back ViewIntroduction Selecting LocationBefore YOU Begin PRE-INSTALLATION Preparation ClearancesMantel Clearances FramingPRE-INSTALLATION Preparation General Venting Location of Vent TerminationGeneral Venting Venting Installation Installation PrecautionsInstallation Planning Installation for Horizontal Termination Installing Vent System in a ChaseVent Opening Requirements Horizontal Termination Configurations Horizontal VentingInstallation for Vertical Termination Flat Ceiling InstallationCathedral Ceiling Installation Vertical Termination ConfigurationsHigh Altitude Installation Parts Lists for Venting Kits and ComponentsVanguard Rigid Venting Installation Wall Switch InstallationVanguard Flexible Venting Simpson Dura-Vent GS 4 x 6 5/8Optional Wireless HAND-HELD Remote Control Installation Electrical Hookup for Blower AccessoryInstalling Receiver Installing Battery in Hand-Held Remote Control Unit GAS Line HOOK-UPGAS Supply Testing Installing LOG SETPilot Assembly Adjustment Decorative FacingBurner Flame Adjustment Operating Guidelines and Maintenance InstructionsBurner Removal Cleaning Maintenance Operating FireplaceLighting Instructions Optional Remote OperationTo Turn OFF GAS To Appliance Replacement Parts Service Hints Technical ServiceWiring Diagram Parts Under WarrantyTroubleshooting Observed Problem Possible Cause RemedyObserved Problem Possible Cause Company Gas leak. See Warning statement Accessories Replacement Parts List Wall Switch KITPilot Assembly Blower KIT DavdbkAssembly Door AssemblyEND Glass Assembly Screen AssemblyOwners Registration Form Postage Required 105706-01B Warranty Information