14
VENTING INSTALLATION
Installation for Vertical Termination (Cont.)
VENTING INSTALLATION
Continued
7.
Note: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construction material. Make sure and meet the minimum allowable clearances to combustibles. Do not fill any of the required air spaces with insulation.
Cathedral Ceiling Installation
1.Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Mark the outline of the cathedral ceiling support box on the roof sheathing using the locating hole as a center point.
2.Cut the hole 1/8" larger than the support box outline (see Figure 26).
3.Lower the support box through the hole in the roof until the bottom of the box extends at least 2" below the ceiling (see Figure 26). Align the support box vertically and horizontally using a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.
4.Using tin snips, cut the support box from the top corners down to the roofline and fold the resulting flaps over the roof sheath- ing (see Figure 27). Apply a bead of
5.Complete the cathedral ceiling installation by following the same procedures outlined in steps 2 through 7 for Flat Ceil-
ing Installation.
Level
Cathedral ceiling |
support box |
2" minimum below |
finished ceiling |
Cut hole 1/8" larger than support box when projected onto roofline
Figure 26 - Cathedral Ceiling Support Box Installation
Vertical Termination Configurations
Figures 28 through 31 show four different configurations for vertical termination. All connections must be sealed with high temperature silicone sealant as specified in the second warning statement on page 9.
Venting with Two 90° Elbows
Vertical (V) | Horizontal (H1) + |
5' min. | Horizontal (H2) |
2' max. | |
6' min. | 4' max. |
7' min. | 6' max. |
8' min. | 8' max. |
20' max. | 8' max. |
45° Starter Elbow
Required
Figure 28 - Vertical Rigid Venting Configuration Using Two 90° Elbows with Two Horizontal Runs
| Venting with One 90° Elbow | |
| Vertical (V) | Horizontal (H) |
| 5' min. | 2' max. |
| 6' min. | 4' max. |
| 7' min. | 6' max. |
45° Starter | 8' min. | 8' max. |
Elbow | 20' max. | 8' max. |
Required |
|
|
Figure 27 - Installed Cathedral Ceiling Support Box
Figure 29 - Vertical Rigid Venting Configuration Using One 90° Elbow
For..com