Nortel Networks FastRad manual FastRAD Installation Guide

Page 19

9

2.Put the two screws in the wall leaving 10 mm (3/8 in) of each screw exposed. The marks on the template show where the two screws are placed. After the screws are in place, remove the paper template.

Figure 4 – Mounting the FastRAD

3.Place the two keyhole slots at the back of the FastRAD over the screws and slide the FastRAD onto the screws.

When the FastRAD is securely mounted, you are ready to start programming.

FastRAD Installation Guide

Image 19
Contents FastRAD Installation Guide Page Table of Contents FastRAD Installation Guide Please Read Carefully Canadian & US Safety Installation InstructionsFor equipment with internal power supplies For equipment with external power suppliesRead and understand all instructions Important Safety InstructionsIndustry Canada Notice Please Read Carefully Canadian RegulationsUS Regulations Address for warranty and repairs in the US FastRAD Regulations FastRAD Installation Guide Pstn Environment check list Package check listNorstar ICS Remote Tools software and documentation package Special check listElectrical RequirementsCTS Requirements for PC communicationConnecting the FastRAD LED Mounting the FastRAD FastRAD Installation Guide Programming the FastRAD Starting a programming session GEN Display showsGeneral Programming Programming Alarm Reporting Clear Retry mins Programming Data Answer delay Press to end programming FastRAD Installation Guide Enter password FastRAD Programming Record Programming RecordDelay FastRAD Installation Guide P0855601 Issue