Pride Mobility INFMANU3210 manual N T E N T S, Iii

Page 3

 

C O N T E N T S

 

I.

INTRODUCTION

4

II.

SAFETY

5

III.

INSTALLATION

8

IV.

OPERATION

15

V.

TROUBLESHOOTING

19

VI. MAINTENANCE SCHEDULE

21

VII. WARRANTY

22

SilverBoom 300

www.silverstarlifts.com

3

Image 3
Contents SilverStar Phone Number Purchase Date Serial Number F E T Y G U I D E L I N E SIII N T E N T SInformation Exchange N T R O D U C T I O NInternet and Private Purchases PURCHASER’S Agreement Shipping and DeliveryS a F E T Y Product Safety SymbolsS a F E T Y Operator Positioning Lifting Capabilities InstallationLifting NON-PRIDE Items Prelift InspectionI . Installation Power Rotating Base Shroud RE- MovalDetermine L-BASE Location Assembling the Lift Trunk Installation Silverboom 300 Manual Rotation onlyTo adjust the height adjustment ring Hatchback INSTALLATION- MINIVANS, Station WAGONS, ETCTools needed for installation BOOM-ARM AdjustmentTo adjust the boom-arm Base InstallationMounting Bolts Base Cap Installation Electrical Wiring InstallationFUSE25-AMP Crimp Here Automobile Battery O P E R a T I O N HAND/REMOTE Control OperationLifting the Mobility Product To replace the batteries of the remote controlUsing a C-arm Manual Lift Strap Operation BOOM-ARM Manual Rotation Models with a Power Rotating BaseLift Stops Operating TroubleshootingTo reset the main circuit breaker Lift will not OperateTo restore proper lifting strap travel Perform every 6 months Perform every 36 months Power Rotating Base onlyM a I N T E N a N C E S C H E D U L E Perform prior to daily useI . W a R R a N T Y THREE-YEAR Transferable Limited WarrantyONE-YEAR Warranty Service Checks and Warranty ServicePage INFMANU3210