I I I . I N S T A L L A T I O N
TRUNK INSTALLATION (SILVERBOOM 300 MANUAL ROTATION ONLY)
Position the
ASSEMBLING THE LIFT
1. Insert the upper post into the
NOTE: When inserting the upper post into a power rotating base, a slight adjustment of the sprocket may be needed to align the insertion hole of the sprocket with the lower post located inside the power rotating base. This can be done by inserting the upper post into the sprocket hole and moving it until the upper post descends into the power rotating base’s lower post.
2.Slide the height adjustment ring (see figure 6) over the upper post and tighten the setscrew (a good start- ing point is approximately 12 in. (30.5 cm) down from the top of the upper post). See figure 4. To ensure safe operation, the height adjustment ring must be secured no closer than 6 in. (15 cm) from the top of the upper post.
WARNING! Failing to tighten the height adjustment ring setscrew could cause damage to your lift, mobility product, and vehicle.
WHEELWELL |
Figure 4. L-Base (Trunk Installation)
!
MINIMUM OF 6” (15 CM)
!
HEIGHT ADJUSTMENT RING
UPPER POST
Figure 5. Upper Post Installation
NOTE: The height adjustment ring may need to be adjusted down so the
NOTE: If the length of the upper post for the power rotating base needs to be made shorter dur- ing installation to ensure a proper fit into the ve- hicle, a qualified technician should remove the up- per post cap, cut the necessary length from the top of the post, then reinstall the upper post cap See figure 13A.
PROHIBITED! Do not cut any length from the bottom of the upper post of the power rotating base.
SETSCREW
Figure 6. Height Adjustment Ring Assembly
SilverBoom 300 | www.silverstarlifts.com | 9 |