Greenheck Fan 473501 manual Energy Wheel Maintenance

Page 23
Segment Retaining Clip
Energy Wheel
Cassette

Energy Wheel Maintenance

WARNING

Whenever performing maintenance or inspections, always disconnect the power source.

Inspection

The wheel should be inspected semiannually in accordance with the maintenance schedule. Maintenance of the wheel consists

mainly of inspecting the wheel for cleanliness and then checking the drive motor, belt, and pulley for wear. If the wheel layers appear dirty, the wheel should be disassembled and cleaned.

The wheel rotates through the two airstreams which are moving in opposite directions, the wheel is self-cleaning, up to a point. If the wheel media becomes blocked by

dirt or dust, or if the media collects a layer of smoke residue or an oily film, the energy transfer efficiency drops.

The main factor in the frequency of cleaning is the cleanliness of the air. If air filters are not changed frequently, the wheel will collect contaminants and will then have to be cleaned.

Wheel Disassembly

Wheels are part of a cassette that may be pulled from the unit for easy access. There may be a small damper assembly or other component that blocks removal of the cassette. Before sliding out the cassette or any other component, disconnect any power supply cord and secure it so it cannot jam or otherwise get damaged.

Each wheel has removable segments that hold the coated layers of media and each segment is held in place with two retaining

clips located on the outer rim of the wheel. When removing more than one segment, remove them in sequence from opposite

sides of the wheel (180 degrees apart) to reduce the imbalance. Secure the wheel against rotation. Carefully release the two retaining clips and swing them fully open. The segment can now be removed by pushing the face of the segment close to the outer rim of the wheel. Wheel segments are built to close tolerances and the segment may have to be jiggled to remove it. Do not use a hammer or otherwise force the segment because these are high value items and are not built to withstand abuse.

Whenever retaining clips are opened, they should be closed as soon as possible. If the wheel should rotate when a clip is open, the clip will jam against the bearing support bar and could cause damage.

Cleaning

Maintenance or cleaning of the wheel segments should be done with the segments removed from the wheel cassette to avoid splashing liquids or cleaning agents inside the cabinet. If the energy wheel appears excessively dirty, it should be cleaned to ensure maximum operating efficiency. Only excessive buildup of foreign materials needs to be removed.

DISCOLORATION AND STAINING OF ENERGY RECOVERY WHEEL DOES NOT AFFECT ITS PERFORMANCE.

Thoroughly spray the wheel matrix with a household cleaner such as Fantastik™ or the equivalent. Gently rinse with warm water and use a soft brush to remove any heavy accumulations. A detergent/water solution can also be used. Avoid aggressive organic solvents, such as acetone. Wheel segments can be soaked in the above solution overnight for removal of stubborn dirt or accumulations.

After cleaning is complete, shake excess water from the wheel or segments. Dry the wheel or segments before putting them back into the cassette.

Reassembly

When reinstalling the segments, be sure to install them with the correct face toward the motor side of the cassette. Note that one face of each segment is smooth and the other face has a reinforcing channel or support cut into the surface.

Wheel Segment

Wheel Segment

(Pulley Side)

(Motor Side)

Energy Recovery Wheel Belt

Inspect belts each time filters are replaced. Belts that look chewed up or are leaving belt dust near the motor pulley may indicate a problem with the wheel. Be sure to inspect wheel for smooth and unrestricted rotation. If a belt requires replacement, contact the local Greenheck representative. Instructions for replacement will ship with the new belt.

Energy Recovery Wheel Bearing

In the unlikely event that a wheel bearing fails, the bearing is behind a removable plate on the wheel support beam (slide cassette halfway out of cabinet to access). Contact the local Greenheck representative for detailed instructions on how to replace the bearing.

Model ERCH-HP Energy Recovery Unit 23

Image 23
Contents Model ERCH-HP General Safety InformationHandling Inspection and Maintenance during StorageReceiving UnpackingTable of Contents Models and Capacities Product OverviewCoils SubassembliesLocation of components in the module will vary Heat Pump ModuleUnit Weights and Recommended Roof Opening InstallationDimensional Data ERCH-HP 20 ERCH-HP Service ClearancesLifting Lugs LiftingSet the Unit Lift Roof Curb Mounting Curb Outside Dimensions and WeightsInstall Ductwork Exhaust Weatherhood Ductwork ConnectionsRail Mounting / Layout Start-Up Unit Voltage Imbalance Pre-Start-Up ChecklistStart-Up Procedure Unit Start-Up Checklist Electrical Information Condensate Drain Trap Discharge Air Temperature SensorPlumbing / Piping Overview Day Timer or On/Off Switch Optional Remote Control PanelWiring Schematics Indicator Lights powered by the ER UnitOptional Control Center Components Optional Frost Control TimerElectrical Controls Variable Frequency Drive VFD Phase MonitorOptional Economizer Dirty Filter Sensor Optional Rotation SensorStart-Up Adjust the Air SealsEnergy Wheel Sequence of OperationEnergy Wheel Maintenance Heat Pump Overview Energy Wheel TroubleshootingFactory-Installed Heat Pump System Components Heat Pump Controls Refrigeration System Schematic Typical Operating Conditions Intelligent Reset Unit Protection Module UPM Fault IndicationsLockout Reset FX05 Furnace Controller Troubleshooting Controller AlarmsDDC Controller Measured Airflow Troubleshooting AirflowTroubleshooting Unit Design AirflowResistance Troubleshooting Note Troubleshooting Refrigeration CircuitTwo hours. Recheck for open circuit Check bulb for contact Check entering air wet bulb conditions Worn oil pump Replace the oil pump Dampers Routine MaintenanceMaintenance Frequency Maintenance Procedures LubricationFan Bearings Fan MotorsFan Wheel and Fasteners Coil Maintenance Internal Filter MaintenanceExternal Filter Maintenance Maintenance Log Warranty

473501 specifications

Greenheck Fan 473501 is a significant player in the world of ventilation solutions, specifically designed to meet the increasing demands for efficiency and effectiveness in air movement. This commercial-grade fan is particularly noted for its high performance and reliability, making it a top choice for various applications, ranging from industrial settings to larger commercial spaces.

One of the main features of the Greenheck 473501 is its energy-efficient design. It is engineered to minimize energy consumption while maximizing airflow, allowing users to achieve optimal performance without incurring high utility bills. The fan is equipped with a powerful motor that not only ensures consistent airflow but also contributes to its overall longevity and durability.

The fan boasts an impressive air performance rating, which is crucial for environments that require precise temperature and humidity control. With adjustable airflow settings, users can customize the fan’s operation to suit specific needs, whether that means circulating air in a warehouse or exhaust in a manufacturing facility.

Another standout characteristic is the fan's robust construction. Built with corrosion-resistant materials, the Greenheck 473501 is ideal for use in harsh environments, where exposure to moisture and other elements could compromise lesser fans. The design also incorporates noise-reducing technologies, making it suitable for settings where quiet operation is essential, such as schools, hospitals, and office buildings.

In terms of installation, the Greenheck 473501 is designed for versatility. It can be easily integrated into various ventilation systems, whether for new constructions or upgrades to existing infrastructure. Its compact footprint allows for convenient placement without sacrificing performance.

Furthermore, Greenheck offers extensive support and resources for this model, ensuring users have access to the information necessary for optimal operation, maintenance, and any potential troubleshooting.

Overall, the Greenheck Fan 473501 represents a harmonious blend of efficiency, durability, and flexibility, making it an ideal choice for those seeking a high-quality ventilation solution that meets contemporary environmental standards while delivering reliable performance across diverse applications.