Haier AC282AFEAA, AC522AFERA, AC482AFEAA, AC362AFEAA, AC602AFEAA, AC362AFERA, AC282AFERA Good Badbad

Page 20

Installation of Indoor Unit

DRAIN PIPING

Install the drain pipe with downward gradient (1/50 to 1/100) and so there are no rises or traps in the pipe.

Use general hard polyvinyl chloride pipe (VP25)[outside diameter 38 mm.]

During installation of the drain pipe,be careful to avoid applying pressure to the drain point of the unit.

When the pipe is long,install supporters(Fig 11). Do not perform air bleeding.

Always heat insulate (8mm or over thick) the indoor side of the drain pipe.

Fig. 11

GOOD

BADBAD

Supporter 5 to 6.5 ft

(1.5 to 2m)

18

Image 20
Contents Operation & Installation Manual Contents Disposal of the old air conditioner EAA ERASafety Precautions Safety Precautions Features and Functions Automatic OperationPress the AIR Flow Direction Vertical SET button Press the AIR Flow Direction Horizontal SET buttonRIGHT/LEFT Name of Parts For series 282, 362, 422, 482Cleaning and Care Following four procedures are for series 282, 362, 422, 482Operation Tips Operation and Performance Heating PerformanceInstallation of Indoor Unit LocationSelecting the Mounting Position Indoor Unit Install the room air conditioner as follows Supension-bolt pitch should be as shownDrilling the Holes and Attaching the Suapension Bolts For HALF-CONCESLED Installation Installing the Coupler Heat Insulation Flat washerGood Badbad Installation of Indoor Unit Electrical Wiring Electrical Requirement FRESH-AIR Intake T N 1 2 Customer Guidance Trouble Shooting Followings are not problemsPoor cooling or heating Poor coolingSeries RemarksError display For EAA series Haier Group