Haier HDU-18HF03, HDU-18CF03, HDU-28CF03 Requirements, Pipe and insulation material, Hose

Page 30

Installation Manual For Indoor Unit

! Caution

In order to drain water normally, the drain pipe shall be processed as specified in the installation manual and shall be thermal insulated to avoid dew generation. Improper hose connection may cause indoor water leakage.

Requirements

The indoor drain pipe shall be thermal insulated.

The connection part between the drain pipe and the indoor unit shall be insulated so as to prevent dew generation.

The drain pipe shall be slant downwards (greater than 1/100). The middle part shall not be of S type elbow, otherwise abnormal sound will be produced.

The horizontal length of the drain pipe shall be less than 20 m. In case of long pipe, supports shall be provided every 1.5 ñ 2m to prevent wavy form.

Central piping shall be laid out according to the following figure.

Take care not to apply external force onto the drain pipe connection part.

1.5m~2m

Support

 

 

 

Insulation

Down slope

S type elbow

(supplied by the user)

above 1/100

 

To the largest (app. 10cm)

VP30

Down slope above 1/100

Pipe and insulation material

Pipe

Rigid PVC pipe VP31.5mm (internal diameter)

 

 

Insulation

Foamed PE with thickness above 7 mm

 

 

Wall

Outside

Slant

Drain pipe (supplied by the user)

Hose

Drain pipe size: (3/4") PVC pipe

The hose is used for adjusting the off-center and angle of the rigid PVC pipe.

Directly stretch the hose to install without making any deformation.

 

 

 

 

 

The soft end of the hose must be fastened with a hose clamp.

 

 

 

 

 

Please apply the hose on horizontal part

 

 

 

 

 

 

Hose

Hose clamp

Insulation treatment:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wrap the hose and its clamp until to the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

indoor unit without any clearance with

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

insulating material, as shown in the figure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subsidiary insulation

Insulation

 

Rigid PVC pipe

 

 

 

 

 

 

 

 

 

 

 

 

Drain confirmation

During trial run, check that there is no leakage at the pipe connection part during water draining even in winter.

29

Image 30
Contents Duct Type AIR Conditioner Table of Contents Disposal of the old air conditioner Safety Precautions Make sure the system is groundedDo not wash the air conditioner with water Outdoor Rated Maximum Minimum IndoorCooling Heating IndoorParts and Functions Power ON/OFF Parts and Functions OperationCool Fan operation Auto RUN, COOL,HEAT and DRY operation 3Timer setting 1After unit start, select your desired operation mode2TIMER mode selection 4Confirming your settingTime confirming for Timer on Press Timer button to change Timer mode3Time setting for Timer on 5Time setting for Timer OFFCooling, dehumidifying mode Heating mode This series changeover switch is set 1. on 2.OFF 3.OFF 4.OFF Malfunction Unit fails to startMalfunction Followings are not malfunction Care and Malntenance Points to observeWhen heating is started For Preparation of HeatingHot KeepIs The Unit Installed Correctly Installation placeInstallation Manual For Wire Controller Install wire controllerIndoor unit wiring Installation Manual For Indoor Unit Safety precautionsIndoor unit Installation Manual For Indoor Unit Sketch map of long duct Installation of air sending duct Installation of air return ductThermal insulation of duct Foundation bolt Requirements Pipe and insulation materialHose Allowable pipe length and drop Pipe material and size Supplementary refrigerantConnection of refrigerant pipe Vacuum pumping Open all valvesGas leakage detection Electric wiring Haier Group