1.Remove the input power to the machine.
2.Perform the Case Cover Removal Procedure.
3.Locate H1 and H2 on the control board terminal strips. See Wiring Diagram.
4.Place the voltage control to maximum.
5.Turn machine on and close trigger switch.
WARNING
ELECTRIC SHOCK can kill.
•Have an electrician install and service this equipment. Turn the input power OFF at the fuse box before working on equipment. Do not touch electrically hot parts.
Turn the machine OFF between each test.
6.On 120 Volt machines you should see 120 VAC or input voltage at H1 and H2 on the terminal strips.
7.On 230 Volt machines you should see 230 VAC or input voltage at H1 and H2 on the terminal strips.
8.If the correct input voltage is not at H1 and H2, check for correct input voltage at 1 and 6 and not at H1 and H2, possible bad Control Board.
9.If the correct voltage is being applied at 1 adn 6 and not at H1 and H2, possible bad Control Board.
Secondary Test Procedure
Note: Secondary voltages will vary proportionately with primary input voltage. For this test, place voltage control potentiometer to maximum.
1.Locate X1 and X2. See Wiring Diagram. See
Figure F.4.
2.Isolate the two secondary leads located in the Rectifier. Turn the machine on and close the gun trigger.
3.On 120 Volt Machines we should see 21 VAC at X1 and X2.
4.On 230 Volt machines we should see 25 VAC at X and X2.
5.If any of the voltages are incorrect or missing, check for loose or broken connections. Possible bad transformer.