Friedrich ZQ05B10, ZQ07B10 manual Pulling Vacuum

Page 11

Equipment needed: Vacuum pump, charging cylinder, manifold gauge, brazing equipment, pinch-off tool capable of making a vapor proof seal, leak detector, tubing cutter, hand tools to remove components and service valve.

 

 

COMPOUND GAUGE

 

 

 

 

MANIFOLD

 

 

 

 

 

GAUGE

 

 

 

 

 

B

A

CONDENSER

 

 

SEE INSETS

 

(HIGH PRESSURE SIDE)

 

 

 

 

 

BELOW

 

 

 

 

 

 

 

COMPRESSOR

 

 

 

 

 

 

 

EVAPORATOR

 

 

 

 

(LOW PRESSURE SIDE)

 

 

 

CAPILLARY TUBE

 

 

 

 

 

 

Figure 20

 

 

 

LO

HI

CHARGING CYLINDER

 

 

A

 

 

A

 

B

EXTERNAL VACUUM PUMP

B

 

 

 

 

 

 

C

 

 

Figure 21A-Pulling Vacuum

 

Figure 21B-Charging

 

 

— 11—

 

 

 

 

Image 11
Contents Room Air Conditioner Service and Parts Manual ZStar Contents Preface FeaturesSpecifications Insulation Resistance Test Safety PrecautionsLocations of Controls Cabinet Disassembly InstructionsMechanical Parts Front GrilleORIFICE, Turbo FAN and FAN AIR Handling PartsAIR Guide Upper Overload Protector Electrical PartsAIR Guide Thermostat Rotary SwitchCompressor CapacitorCondenser Power CordRefrigerant Cycle Capillary Tube EVAPORATOR/CONDENSERPulling Vacuum Outside Dimensions unit mm Troubleshooting GuideCondenser Coils Piping SystemUnit is running but cooling is ineffective Troubleshooting GuideFails to Start Room AIR Conditioner Voltage Limits Check for continuity Refer to Complaint Cause Remedy Model ZQ05B10,ZQ07B10 Circuit DiagramExploded View ZQ05B10 Service Parts ListZQ07B10 Memo Use Factory Certified Parts