Woodstock W1754 Belts, To adjust/replace the V-belts, do these steps, Pulley Alignment on

Page 26

W1754 20" Planer With Mobile Base

MAINTENANCE

V-Belts

V-belt removal and replacement is simply a matter of adjusting the motor mount, rolling the belts off of the pulleys and replacing them with new belts, then reten- sioning them.

Always replace V-belts with a matched set of 3 belts, or belt tension may be unven among the 3 belts and may cause premature belt failure.

To adjust/replace the V-belts, do these steps:

1.DISCONNECT THE PLANER FROM POWER!

2.Remove the motor and front access panels and V- belt cover.

3.Using a 19mm wrench, loosen the hex nuts on the tension rods shown in Figure 15.

4.Lift the motor up and slide the V-belts off of the pulleys.

5.Make sure the pulleys are in alignment as outlined in

Pulley Alignment on Page 37.

6.Slide the new belts onto the pulley, lower the motor, and tighten the fasteners loosened in Step 3.

7.Check belt deflection as shown in Figure .

Note: The correct tension for the V-belts is 14"–12" deflection when pushed in the center with moderate pressure. After the first 16 hours of belt life, reten- sion them, as they will stretch and seat during this time.

8. Close the V-belt cover and replace the front and motor access panels.

OFF

Tension

Rod

Figure 15. Fasteners needed to be loosened for V-belt replacement.

������

����������

������

Figure 16. Checking belt deflection.

-24-

Image 26
Contents Planer with Mobile Base Page Contents Introduction Woodstock Technical SupportIntroduction Controls and Features Safety Standard Safety InstructionsAlways Lock Mobile Bases Before Operating Machinery Additional Safety Instructions for Planers 220V Operation Electrical SpecificationsElectrical Unpacking SetupItems Needed for Setup InventoryHardware and Tools Not Shown Machine PlacementLifting Planer Cleaning Machine These items are coated and must be cleanedExtension Wings Extension wing fasteners Leveling controlsHandwheel, Dust Hood Caster To install the handwheel, do these stepsTo install the caster and foot pedal, do these steps To check the gearbox oil level, do these steps Connecting to PowerGearbox Oil Level Test Run To perform a test run, do these stepsRecommended Adjustments Tighten V-BeltsBasic Operation OperationsGeneral Basic steps of operating the planer are as followsOperation Tips Feed Speed Feed control knob positionsBed Rollers Adjustment Height Range 002-0.020To adjust the bed rollers, do these steps Accessories Planer AccessoriesOperations Maintenance Schedule MaintenanceCleaning Pulley Alignment on To adjust/replace the V-belts, do these stepsBelts Lubrication To inspect the knives, do these steps ServiceInspecting Knives Setting/Replacing Knives To set the knives, do these stepsTo adjust the chain tension, do these steps Chain TensionTable Parallelism Maximum Allowable TolerancesTo adjust the table parallelism, do these steps Table micro-adjustment screwsRollers, Breaker Pressure Bar Heights Distance Below Knife Edge at *BDCLocation Service To adjust roller spring tension, do these steps Spring TensionTo calibrate the scale, do these steps Scale CalibrationLoosen the chip deflector mounting bolts see Figure Anti-Kickback Fingers Anti-kickback fingersPulley Alignment Example of checking belt AlignmentW1754 Electrical Components Motor junction boxW1754 20 Planer With Mobile Base Troubleshooting Problem Possible Cause Corrective ActionCutting Headstock Assembly Parts Breakdown Headstock Assembly Parts List PART# DescriptionCutterheadpulley Gearbox Parts Breakdown Gearbox Parts List Base Breakdown Base Parts List Table Breakdown & List Columns Breakdown Columns Parts List Labels & Cosmetic Parts Warranty Page Warranty Registration CommentsBOX BELLINGHAM, WA