RIDGID kt-190 Special Applications Procedure, Isolating Multi-Zone Systems, Series Operation

Page 10

Model KT-190 and KT-200 Pipe Thawing Units

6.If current is below 15 amps on KT-200, switch to B. If current is still below 15 amps, switch to high position on center switch and right switch up to C.

7.Continue until 15 amps is reached but not exceeded; D switch setting is used with long runs.

Multi-Zone System

If you are dealing with multi-zones it will be necessary to break the electric current flow to specific zones.

1.Make sure unit is unplugged and switch is in the OFF position and cables are completely uncoiled.

2.Place the pipe clamps several feet apart.

Isolating Multi-Zone Systems

1.Break and cap pipe at point B. This prevents cur- rent flow through the second zone and allows for 100% of the current to be used in Zone #1. Do not let pipe ends contact one another.

2.Break the pipe at Point A and place pipe clamps as shown in Figure 7. This forces the current to flow through Zone #1. Use a container to collect the water.

3.Once Zone #1 is thawed, turn the unit and circulating pump OFF. If Zone #2 is frozen, cap the pipe at Point A Remove the cap from Point B and place a container at Point B to collect the water.

WARNING Making pipe connections before plug- ging in unit prevents arcing between clamp and pipe.

3.Maintain a minimum of 15 feet between clamps when using the KT-190, 4 feet for KT-200, to prevent ex- cessive amp draw.

4.Plug unit into a grounded 15 amp outlet making sure to position the power cord along the clear path se- lected earlier.

5.Move switch to ON (Up position on KT-190. Center switch to low and left switch down to A on KT-200.) If current draw is below 15 amps, select switch B, C, or D to maximize amp draw and reduce thaw time. (Do not exceed 15 amps)

NOTE! If the heat is not restored to piping in 10 minutes, change the location of the clamps to heat a dif- ferent section of the system. If the above steps have been tried without success, the entire zone is frozen and will need to be thawed by following the Isolating Multi-Zone Steps.

4.Place the clamps of the opposites sides of the break at Point B. Once Zone #2 is thawed, turn circulating pump and thawing unit OFF.

5.Reconnect all pipes and check both Zone #1 and #2 for heat.

Special Applications Procedure

Increasing Thawing Capacity on KT-200 Only

WARNING Failure to follow the procedures below for parallel and series operation of the thawing units can re- sult in electrical shock or damage to the equipment.

Series Operation

Units arranged in series work best for long pipe lengths.

1.Position units near the frozen section of pipe and next to one another such that cable lugs are toward pipe.

2.Make sure the units are unplugged and center switch is in the OFF position.

Zone #1

Radiator

 

 

Zone #2

Radiator

 

 

Radiator

Water

B Break

flow

 

 

Break

Circulating Pump

A

 

Furnace

Radiator

Pipe Thawer

Figure 7 – Multi Zoned System

8

Ridge Tool Company

Image 10
Contents Pipe Thawing Units Table of Contents KT-190 and KT-200 Pipe Thawing Units Electrical Safety General Safety InformationWork Area Safety Personal SafetySpecific Safety Information Description and SpecificationsProblem Diagnostics Tool Inspection Tool AssemblyInstalling Cables with Clamps Tool Set-UpOperating Instructions Thawing Tap Water LinesTool Removal Thawing Frozen Hydronic Systems Single Zone SystemIsolating Multi-Zone Systems Special Applications ProcedureMulti-Zone System Increasing Thawing Capacity on KT-200 OnlyTool Storage Maintenance InstructionsTool Maintenance Parallel OperationKT-190 Thawer 115V/60Hz Service and RepairElectrical Schematics KT-200 ThawerDescongeladoras de tuberías KT-190 y KT-200 Índice Seguridad eléctrica Información general de seguridadSeguridad en la zona de trabajo Seguridad personalServicio Información específica de seguridadUso y cuidado de la máquina Seguridad de la Descongeladora de tuberíasDiagnóstico de problemas Descripción y especificacionesEn tuberías domiciliarias de agua potable Ensamblaje de la máquinaInstalación del cable con pinza Inspección de la Descongeladora Preparación de la máquinaInstrucciones de funcionamiento Descongelación de tuberías domiciliarias de agua potableDescongelación de redes hidrónicas congeladas Extracción de la DescongeladoraRed de zona única Red multizonal Cómo aislar una red multizonalFuncionamiento en serie Procedimiento para métodos especialesFuncionamiento en paralelo Servicio y reparaciones Instrucciones de mantenimientoAlmacenamiento de la máquina Mantenimiento de la máquinaDescongeladora KT-190 115V/60Hz Esquemas eléctricosDescongeladora KT-200 Descongeladoras de tuberías KT-190 y KT-200 Ridge Tool Company