3.Connect one end of the pigtail (Ridge Catalog #62812) on the right lug of the left unit, and the other end on the left lug of the right unit.

4.Attach pipe thawing leads to remaining lugs.

5.Place one clamp on either side of the frozen section of pipe.

WARNING Making pipe connections before plug- ging in unit prevents arcing between clamps and pipe.

6.Plug the units into outlets that are NOT on the same circuit. (Protected by separate fuses).

WARNING Both thawing units must be plugged into electrical outlets before switching unit ON. Failure to follow the procedure can result in electrical shock.

7.With two units connected in series, seven power set- tings are available with the KT-200 by using the switches on both units. The combinations are AA, AB, BB, BC, CC, CD, DD.

NOTE! A circuit will not be completed until the switch of both units is in the ON position.

Unit

Unit

#1

#2

 

Frozen Section

 

 

 

 

Figure 8 – Series Set-Up

2.Make sure units are unplugged and switches are in the OFF position and cables are completely uncoiled.

3.Attach cables and clamps to lugs.

4.Place clamps on either side of the frozen section of pipe.

WARNING Making pipe connections before plug- ging in unit prevents arcing between clamp and pipe.

5.Plug units into outlets that are NOT on the same cir- cuit. (protected by different fuses).

WARNING Both thawing units must be plugged into electrical outlets before switching unit ON. Failure to fol- low the procedure can result in electrical shock.

6.The power settings available are AA, BB, CC, and DD with the KT-200.

NOTE! With both units on the same setting both KT-200 amp. meters should read approximately the same. If this does not occur, turn both units OFF and exchange the cables on one unit. The correct polarity is achieved by the cable hook-up that pro- duces the lowest amp. meter reading.

IMPORTANT: Failure to follow above set-up will result in most current flowing through the ad- jacent clamps and not the pipe.

Maintenance Instructions

WARNING

Make sure unit is unplugged from power source be- fore performing maintenance or repairs.

Parallel Operation

Units arranged in parallel work best for larger pipes di- ameters.

Unit #1

Unit #2

Frozen Section

Figure 9 – Parallel Set-Up

1. Position units near frozen section of pipe.

Tool Maintenance

1.Replace damaged, frayed, broken or worn cables.

2.Periodically clean lugs with steel wool and emery cloth.

3.Replace damaged, frayed, broken or worn cords.

4.Keep clamps dry and clean.

Tool Storage

WARNING Electrical equipment must be kept indoors or well covered in rainy weather. Store the tool in a locked area that is out of reach of children and people unfamiliar with Pipe Thawing tools. This tool can cause serious injury in the hands of untrained users.

Ridge Tool Company

9

Image 11
Contents Pipe Thawing Units Table of Contents KT-190 and KT-200 Pipe Thawing Units Personal Safety General Safety InformationWork Area Safety Electrical SafetyDescription and Specifications Specific Safety InformationProblem Diagnostics Tool Set-Up Tool AssemblyInstalling Cables with Clamps Tool InspectionThawing Tap Water Lines Operating InstructionsThawing Frozen Hydronic Systems Single Zone System Tool RemovalIncreasing Thawing Capacity on KT-200 Only Special Applications ProcedureMulti-Zone System Isolating Multi-Zone SystemsParallel Operation Maintenance InstructionsTool Maintenance Tool StorageKT-200 Thawer Service and RepairElectrical Schematics KT-190 Thawer 115V/60HzDescongeladoras de tuberías KT-190 y KT-200 Índice Seguridad personal Información general de seguridadSeguridad en la zona de trabajo Seguridad eléctricaSeguridad de la Descongeladora de tuberías Información específica de seguridadUso y cuidado de la máquina ServicioDescripción y especificaciones Diagnóstico de problemasInstalación del cable con pinza Ensamblaje de la máquinaEn tuberías domiciliarias de agua potable Preparación de la máquina Inspección de la DescongeladoraDescongelación de tuberías domiciliarias de agua potable Instrucciones de funcionamientoRed de zona única Extracción de la DescongeladoraDescongelación de redes hidrónicas congeladas Cómo aislar una red multizonal Red multizonalFuncionamiento en paralelo Procedimiento para métodos especialesFuncionamiento en serie Mantenimiento de la máquina Instrucciones de mantenimientoAlmacenamiento de la máquina Servicio y reparacionesDescongeladora KT-200 Esquemas eléctricosDescongeladora KT-190 115V/60Hz Descongeladoras de tuberías KT-190 y KT-200 Ridge Tool Company