RIDGID kt-190 manual Tool Removal, Thawing Frozen Hydronic Systems Single Zone System

Page 9

Model KT-190 and KT-200 Pipe Thawing Units

NOTE! This tool is equipped with a thermal overload for added safety. If thawing for long periods of time at maximum current, the unit may shut down auto- matically. Unit will resume operations auto- matically after approximately 3 minutes.

NOTE! The electrical output current of both the KT-190 and KT-200 can take two paths. The shortest distance between the clamps, or the long path around the pipe loop. Therefore, in some sys- tems it is required to break the pipe to eliminate the short path (Figure 7).

Tool Removal

1.When water lines have thawed, turn switch to the OFF position and unplug power cord from the elec- trical outlet.

2.Remove clamps from the pipe.

WARNING Clamp tips are hot and can cause burns.

3.Allow clamps to cool before coiling cables and placing the unit in storage. While the clamps are hot, keep them away from combustible materials or articles that can be damaged by heat.

Thawing Frozen Hydronic Systems

NOTE! Hydronic systems are harder to thaw due to the lower pressure produced by the circulating pump and the greater lengths of pipe required in a sin- gle or multi-zone system.

Single Zone System

1.Circulating pump must be operating.

2.Make sure unit is unplugged and OFF and cables are completely uncoiled.

3.Place one clamp near the furnace and the second clamp next to a radiator.

WARNING Making pipe connections before plug- ging in unit prevents arcing between clamps and pipe.

4.Plug unit into a grounded 15 amp outlet, making sure to position the power cord along the clear path selected earlier.

5.Position switch to ON. (Up position on KT-190. Center switch down to low and left switch to lower A position on KT-200).

Radiator

Radiator

Radiator

Water

Circulating

Flow

Pump

 

Furnace

Pipe Thawer

 

Figure 5 – Single Zone System

Radiator

Radiator

Radiator

 

Pipe Thawer

Water

Circulating

Flow

Pump

 

 

Furnace

Figure 6 – Single Zone System

Ridge Tool Company

7

Image 9 Contents
Pipe Thawing Units Table of Contents KT-190 and KT-200 Pipe Thawing Units Work Area Safety General Safety InformationElectrical Safety Personal SafetyDescription and Specifications Specific Safety InformationProblem Diagnostics Installing Cables with Clamps Tool AssemblyTool Inspection Tool Set-UpThawing Tap Water Lines Operating InstructionsThawing Frozen Hydronic Systems Single Zone System Tool RemovalMulti-Zone System Special Applications ProcedureIsolating Multi-Zone Systems Increasing Thawing Capacity on KT-200 OnlyTool Maintenance Maintenance InstructionsTool Storage Parallel OperationElectrical Schematics Service and RepairKT-190 Thawer 115V/60Hz KT-200 ThawerDescongeladoras de tuberías KT-190 y KT-200 Índice Seguridad en la zona de trabajo Información general de seguridadSeguridad eléctrica Seguridad personalUso y cuidado de la máquina Información específica de seguridadServicio Seguridad de la Descongeladora de tuberíasDescripción y especificaciones Diagnóstico de problemasEnsamblaje de la máquina En tuberías domiciliarias de agua potableInstalación del cable con pinza Preparación de la máquina Inspección de la DescongeladoraDescongelación de tuberías domiciliarias de agua potable Instrucciones de funcionamientoExtracción de la Descongeladora Descongelación de redes hidrónicas congeladasRed de zona única Cómo aislar una red multizonal Red multizonalProcedimiento para métodos especiales Funcionamiento en serieFuncionamiento en paralelo Almacenamiento de la máquina Instrucciones de mantenimientoServicio y reparaciones Mantenimiento de la máquinaEsquemas eléctricos Descongeladora KT-190 115V/60HzDescongeladora KT-200 Descongeladoras de tuberías KT-190 y KT-200 Ridge Tool Company
Related manuals
Manual 27 pages 45.21 Kb