Cisco Systems SN 5428 manual TAC Case Priority Definitions

Page 14

Preface

Obtaining Technical Assistance

Open Tool automatically recommends resources for an immediate solution. If your issue is not resolved using these recommendations, your case will be assigned to a Cisco TAC engineer.

For P1 or P2 cases (your production network is down or severely degraded) or if you do not have Internet access, contact Cisco TAC by telephone. Cisco TAC engineers are assigned immediately to P1 and P2 cases to help keep your business operations running smoothly.

To open a case by telephone, use one of the following numbers:

Asia-Pacific: +61 2 8446 7411 (Australia: 1 800 805 227)

EMEA: +32 2 704 55 55

USA: 1 800 553-2447

For a complete listing of Cisco TAC contacts, go to this URL:

http://www.cisco.com/warp/public/687/Directory/DirTAC.shtml

TAC Case Priority Definitions

To ensure that all cases are reported in a standard format, Cisco has established case priority definitions.

Priority 1 (P1)—Your network is “down” or there is a critical impact to your business operations. You and Cisco will commit all necessary resources around the clock to resolve the situation.

Priority 2 (P2)—Operation of an existing network is severely degraded, or significant aspects of your business operation are negatively affected by inadequate performance of Cisco products. You and Cisco will commit full-time resources during normal business hours to resolve the situation.

Priority 3 (P3)—Operational performance of your network is impaired, but most business operations remain functional. You and Cisco will commit resources during normal business hours to restore service to satisfactory levels.

Priority 4 (P4)—You require information or assistance with Cisco product capabilities, installation, or configuration. There is little or no effect on your business operations.

 

Cisco SN 5428 Storage Router Hardware Installation Guide

xiv

OL-4796-01

Image 14
Contents Cisco SN 5428 Storage Router Hardware Installation Guide Page Cisco SN 5428 Storage Router Hardware Installation Guide Page N T E N T S Front-Panel LEDs Cable and Port Pinouts B-1 Viii Audience OrganizationConventions This document uses the following conventionsCisco.com Related DocumentationObtaining Documentation Documentation Feedback Documentation CD-ROMOrdering Documentation Obtaining Technical Assistance Cisco TAC Website Opening a TAC CaseTAC Case Priority Definitions Obtaining Additional Publications and Information Xvi Product Overview SN 5428 Basic Description SN 5428 Storage Router ChassisPort Descriptions SN 5428 Storage Router Ports10/100 Ethernet Management Port Gigabit Ethernet PortsConsole Port 10/100 Ethernet HA PortFront-Panel LEDs Fibre Channel PortsLED Mgmt ACT Fan Assembly Chassis AirflowPower Supply Power connectorOL-4796-01 Installing the SN 5428 Storage Router Read Safety Notices Installing the SN 5428 Storage Router Read Safety Notices OL-4796-01 Site Planning Installing the SN 5428 Chassis Installing on a Table or a ShelfRack-Mounting the SN 5428 Storage Router Removing the Front Screws from the Sides Installing the Chassis in the Rack Attaching the Optional Cable Guide Cable guide screwInstalling SFP Modules MT-RJ Fiber-Optic Connector and SFP Module SFP Product Number Connector Type Port Usage Mylar Tab SFP Modules Mylar Tab SFP ModuleInserting a Mylar Tab SFP Module Actuator/Button SFP Modules 10 Actuator/Button SFP Module12 Removing an Actuator/Button SFP Module from a Port Bale Clasp SFP Modules 13 Bale Clasp SFP Module15 Removing a Bale Clasp SFP Module with Your Index Finger Connecting to Gigabit Ethernet and Fibre Channel Ports OL-4796-01 Connecting to a Gigabit Ethernet Port Connecting to a Fibre Channel PortConnecting to the 10/100 Ethernet Management and HA Ports 17 Connecting to the 10/100 Management and HA PortsConnecting to the Console Port Stop Bits Flow ControlConnecting Power 18 Connecting the Console Cable19 Power Set to Off Verifying Installation Verifying Start-up OperationsVerify That Network Connections Are Operational Verify That Fibre Channel Connections Are OperationalWhere to Go Next OL-4796-01 Troubleshooting Solving Problems at the Component LevelIdentifying Startup Problems Troubleshooting the Power Supply Troubleshooting a Network or Fibre Channel Port Connection Troubleshooting a Connection to a Gigabit Ethernet PortTroubleshooting Troubleshooting a Connection to a Fibre Channel Port Contacting Customer Service OL-4796-01 Technical Specifications Fuse F1 rating Cable and Port Pinouts Gigabit and Fibre Channel Ports850 62.5 0625 300 m 125 150 m 50.0 500 m 10/100 Ethernet Management and HA Ports Figure B-1 Straight-Through CablesPin Signal Direction Description Console PortRTS OL-4796-01 Numerics IN-2 IN-3 IN-4
Related manuals
Manual 16 pages 39.84 Kb