Setup
Connect Fluid Hose Assembly
1.Connect fluid hose to fluid manifold outlet. Do not install gun spray tip yet.
r_XM1A00_312359_313289_20A
Fluid
Integrator
Hose
NOTICE
Do not assemble static mixer directly to the fluid man- ifold. Install static mixer after first 25 ft. (7.5 m) of inte- grator hose to ensure material doses are completely integrated. Spraying poorly integrated material could require rework of parts sprayed.
2. Tighten all fittings.
Adjust Packing Nuts
1.Fill A and B pump packing nuts with throat seal liq- uid (TSL™) and torque to 50
NOTE:
After the first day of use
2.Fill metering valves A and B packing nuts with throat seal liquid (TSL) and tighten 1/4 turn after nut con- tacts packings; about
TSL | TSL |
NOTE:
For pump and meter valves, check packing nut tightness after first hour of operation and again after 24 hours. Then check as needed, or when TSL discolors or seeps over packing nut. Also check tightness whenever sprayer is transported. Tighten packing nuts only when all fluid pressure is relieved.
22 | 312359J |