Basic Operation
Power On (Alternator Power Supplied Systems)
1.Set main pump air regulator (CD) to minimum set- ting.
2.Open main air valve (E) and main pump and air valve (CA) to start
Main air pressure is displayed on gauge (CC). Fluid Control screen will display after five seconds.
CC | CD |
CA
CE
Basic Operation
Final Setup
Perform the following steps if shutting down during setup.
1.Relieve system pressure. See Pressure Relief Pro- cedure, page 34.
2.Flush and prime system. See Prime (page 27), Flush Mixed Material (page 36) and Park Fluid Pump Rods (page 38).
3.Check ratio accuracy. Run Pump and Metering Test (page 40) and Batch Ratio Dispense Test (page 43) to check ratio accuracy.
View Alarms
When an alarm occurs the alarm information screen automatically displays. It shows the current alarm code along with a bell icon. It also shows the alarm location with top and side views of the sprayer
Power On (Wall Power Supplied Systems)
Turn on main power disconnect. Fluid Control screen will display after five seconds.
Adjust Ratio and Setup
1.Turn key to right (setup position). Yellow LED will flash and the Home Setup screen will display.
2.Press and to change ratio.
3.When desired ratio is displayed, turn key to left. Yel- low LED will turn off.
4.Change optional setup selections to desired param- eters, as described in Set System Settings (Optional), page 24.
There are two levels of error codes: alarms and adviso- ries. A bell icon indicates an alarm. A solid bell icon with an exclamation point and three audible alerts indicate a alarm. And an outlined hollow bell icon and a single audible alert indicate an advisory.
Diagnose Alarms
See Alarm Codes and Troubleshooting, page 52, for causes and solutions to each alarm code.
Clear Alarms
Press to clear alarms and advisories. Press
to return the run (fluid control) screen.
For more information on alarms and alarm codes, see Alarms, page 51.
312359J | 23 |