Initial System Setup
Initial System Setup
Complete the following steps in the order they are listed, as they apply to your specific system, for initial system setup.
1.Check your shipment for accuracy. Ensure you have received everything you ordered. See Component Identification, page 13, to familiarize yourself with typical system components.
2.Mount caster kit, if ordered. See manual 406690 for instructions.
3.Mount hopper brackets, if ordered. See manual 312747 for instructions.
4.Loosely mount hoppers, if ordered, on brackets. See manual 312747 for instructions.
5.Connect bottom hopper outlet if using a gravity feed pump. See manual 312747 for instructions.
6.Tighten hopper mounting bolts. See manual 312747 for instructions.
7.Mount and connect agitator(s) and feed pump(s), if ordered. See manual 312769 for instructions.
8.Mount and connect hopper immersion heater kit, if ordered. See manual 312747 for instructions.
9.Connect recirculation hose, restrictor valve (includ- ing knob and nipple), and recirculation tube. Place in hopper or drum. See manual 312747 for instruc- tions.
10.Replace USB label (front of control panel) with cor- rect language version, if needed.
11.Replace Alarms Codes label (under fluid control valves) with correct language version, if needed.
12.Install hopper/hose heated circulation kit, if ordered. See manual 313259 for instructions.
13.For
14.For
15.For hazardous location sprayers, connect explo-
16.Connect air supply line. See Connect Air Supply, page 21, for instructions and recommendations.
17.Connect fluid hose assembly, including whip hose and gun. See Connect Fluid Hose Assembly, page 22, for instructions. Also connect remote mix manifold, if ordered. See manual 312749 for instruc- tions.
12 | 312359J |