Carrier 48VT(N) Roof Curb Dimensions, Small Curb, Roof Curb Detail, Large Curb

Page 5
SMALL CURB

 

 

 

HVAC unit

HVAC unit

base rails

basepan

 

 

 

 

ROOF CURB DETAILLARGE CURB Sealing

Gasket

Roofcurb

Fig. 4 - Roof Curb Dimensions48VTManual backgroundManual background BManual background

C

F

Anchor screwManual background

Flashing field supplied

Roofing material field supplied

Cant strip field supplied

Manual background Wood nailer*

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background Roofcurb*

Insulation

Manual backgroundManual backgroundManual backgroundManual backgroundManual background(field supplied)

A

E

D

SMALL CURB

A09110

-- A

*Provided with roofcurb

A09090

ROOF CURB DETAIL

Manual backgroundManual backgroundManual backgroundManual background B

C

F

A

E

D

 

LARGE CURB

 

A09095

 

 

 

 

 

 

 

 

 

 

A09111

 

 

 

 

 

 

 

 

UNIT SIZE

CATALOG

A

B

C

D

E

F

NUMBER

IN. (mm)

IN. (mm)*

IN. (mm)

IN. (mm)

IN. (mm)

IN. (mm)

 

 

 

 

 

 

 

 

 

Small

CPRFCURB010A00

11 (279)

10 (254)

 

 

32.4 (822)

 

 

 

 

 

 

CPRFCURB011A00

14 (356)

16 (406)

47.8 (1214)

2.7 (69)

 

 

 

 

 

 

 

 

Large

CPRFCURB012A00

11 (279)

14 (356)

43.9 (1116)

 

 

 

 

 

 

 

 

CPRFCURB013A00

14 (356)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTES:

1. Roof curb must be set up for unit being installed.

2. Seal strip must be applied, as required, to unit being installed.

3. Roof curb is made of 16-gauge steel.

4. Attach ductwork to curb (flanges of duct rest on curb).

5. Insulated panels: 1-in. (25.4 mm) thick fiberglass 1 lb. density.

IMPORTANT: Do not install large base pan HYBRID HEAT

literature dimensional drawing to ensure that “Y” is greater than 14

units onto the small base pan (common curb). The center of gravity

in. (356 mm). Do not install any large base pan unit onto the

on a large base pan HYBRID HEAT unit could overhang the curb

common curb with a “Y” dimension (center of gravity) less than 14

causing an unsafe condition. Before installing any large base pan

in. (356 mm).

unit onto the common curb, check the “Y” distance in the product

Fig. 4 - Roof Curb Dimensions

5

48VT

Image 5
Contents SAFETY CONSIDERATIONS TABLE OF CONTENTSFig. 1 - Unit 48VT-A Installation InstructionsINTRODUCTION RECEIVING AND INSTALLATIONStep 1 - Check Equipment Step 2 - Provide Unit SupportA09146 Fig. 2 - 48VT-A24-30Unit Dimensions48VT--A A09147 Fig. 3 - 48VT-A36-60Unit Dimensions48VT--A 48VT Fig. 4 - Roof Curb DimensionsSMALL CURB ROOF CURB DETAILStep 5 - Rig and Place Unit ACCESS PANELS MUST BE IN PLACE WHEN RIGGINGInspection Rigging/Lifting of Unit See FigStep 8 - Install Gas Piping Step 7 - Install Flue HoodStep 6 - Connect Condensate Drain Fig. 6 - Condensate TrapConfiguring Units for Downflow Vertical Discharge Step 9 - Install Duct ConnectionsFig. 7 - Sediment Trap FIRE OR EXPLOSION HAZARDFig. 8 - Supply and Return Duct Opening Table 1 - Physical Data - Unit 48VT-A48VT--A Horizontal Duct CoversTable 2 - Maximum Gas Flow Capacity Table 1 - Physical Data - Unit 48VT-ACont’dTable 3 - Heating Inputs 48VT--ASpecial Procedures for 208-VOperation Step 10 - Install Electrical ConnectionsHigh-VoltageConnections Control Voltage ConnectionsPRE-START-UP Balance Point Setting-Thermidistator HybridTransformer Protection ThermostatSTART-UP Step 3 - Start-upHeating and Make Adjust- mentsStep 1 - Check for Refrigerant Leaks Step 2 - Unit Sequence of OperationFig. 11 - Burner Assembly Adjust Gas InputCheck Heating Control Check Gas InputCheck Burner Flame Limit SwitchesNormal Operation Airflow and Temperature RiseRollout Switch Step 4 - Start-upCooling and Make Adjust- mentsChecking and Adjusting Refrigerant Charge Indoor Airflow and Airflow AdjustmentsContinuous Fan Operation Gas Heating Fan Speed Set-upTable 6 - Color Coding for Indoor Fan Motor Leads 48VT--ATable 8 - 48VT-AWet Coil Pressure Drop Fig. 14 - Interface Fan Board IFB48VT--A Table 7 - Filter Pressure Drop Table IN. W.CUNIT 48VT--AHeating 48VT--A1295 48VT--A1445 48VT--A1448 48VT--A48VT A Fig. 15 - 208/230-1-60Wiring Diagram, Unit 48VT-AA09209 Fig. 16 - 208/230-3-60Wiring Diagram, Unit 48VT-A48VT--A 48VT--A Fig. 17 - Cooling Charging Table-Subcooling50VT500173 REV A09099Cleaning the Blower Motor and Wheel MAINTENANCEAir Filter Indoor Blower and MotorInduced Draft combustion air Blower Assembly Limit SwitchFig. 18 - Blower Housing and Flue Collector Box Fig. 19 - Unit Access PanelsOutdoor Fan Electrical Controls and WiringRefrigerant Circuit Fig. 20 - Removal of Motor and Blower WheelLoss of Charge Switch Pressure SwitchesHigh-PressureSwitch Gas InputPage LCS - Loss of Charge Switch HPS - High Pressure SwitchFig. 24 - Refrigerant Circuit AccuraterMetering De viceSTART-UPCHECKLIST TROUBLESHOOTINGUNIT OPERATION AND SAFETY HAZARD Synthetic Roof Precautionary Procedure48VT--A PURONR R-410AQUICK REFERENCE GUIDE48VT--A SYMPTOM48VT--A Table 12 - Troubleshooting Guide-HeatingTable 13 - Troubleshooting Guide-LEDStatus Codes I. PRELIMINARY INFORMATION MODEL NO Remove and Store in Job FilesTEMPERATURES PRESSURESCatalog No 48VT---05SI 48VT--AEdition Date 04/09 Replaces 48VT---04SI