3.5Aligning Cases

WARNING

SANYO Cases are heavy and bulky, and require at least two people for unloading, moving, and installation.

Do not walk on the top of the SANYO Cases. Walking on the top of the SANYO Case may lead to serious injury and/or damage to the SANYO Case.

Do not place anything on the top of the SANYO Case or use the top of any SANYO Case for short- or long-term storage.

1.Review layout drawings for spaces where SANYO Cases are to be installed.

2.Based on the layout drawings and the SANYO Case footprint drawings, mark the floor to indicate the exact locations of the base legs (back edge and front edge) on each merchandiser. Multiple SANYO Cases should be aligned based upon the position of the base legs.

3.Snap chalk lines for the front and rear positions of the legs on each row of SANYO Case.

4.Mark the location showing the outside edge of each base leg on each SANYO Case.

3.6Case Leveling

SANYO Cases must be installed level in order to ensure proper performance and drainage.

1.For each lineup of SANYO cases to be joined, use a level (preferably a laser level) to find the highest point on the front and rear chalk lines marked in step 3 above (during Case Alignment).

2.Determine which of the two points marked on the line is higher. This is the highest point in the case lineup.

3.Estimate the number of shims needed for the four corners of each case position, in order to bring all positions to the same height as the highest point found in step 2.

4.For each row, place the first SANYO Case where it will sit over the highest point in the lineup. Ensure that the case is level, using shims as needed.

NOTE: Each base leg should rest on solid supports.

Insert shims as needed if there are any gaps between the floor and each base leg.

5.Continue placing cases in the lineup, working outward to both sides from the position of the first case placed. Use shims to ensure that all cases in the lineup are level.

10

Image 10
Contents MULTI-DECK Fresh Produce Cases 80 7/8, L 96 3/8 / H 80 7/8, L 144 5/8Activity Safety Precautions Table of Contents Care and Cleaning Guidelines Specifications CVW-EXA284 CVW-EXA224CVW-EXA184 CVW-EXA124 Dimensions External Dimensions FootprintCVW-EXA184 / CVW-EXA124 NSF Certification Unloading and Carpentry ProceduresUnloading Instructions & Precautions LocationAligning Cases Case LevelingJoining Instructions  Perimeter gasket is required by NSFConnecting cases CVW-EXA284/224 Installing Patch EndsCVW-EXA184/124 Installing Kickplate Installing Handrail and Bumper Refrigeration, Plumbing & Electrical Procedures Piping Plumbing, RefrigerationWiring Color Code Electrical Guidelines & PrecautionsWiring Electrical DataWiring Diagram Operation Load LimitsInstalling FDA/NSF Thermometer MagnetExterior Panels Daily Cleaning Care and Cleaning GuidelinesMirrors, Fluorescent Lamps, Drain Trap Monthly Cleaning Honeycomb Assemblies at least every 3 months Replacing Fan Motors and Blades ServiceTo replace the fan motors For models with Standard-type AC Fan Motors For models with high-efficiency-type DC fan motors Replacing Electronic Ballasts To replace electronic ballastsReplacing Fluorescent Lamps Lamp Cover END CAPExpansion Valve Danfoss SporlanPage Sanyo E & E Corporation