Ciprico 21021625 B manual Preparing the Installation Site, Weight

Page 10

Preparing the Installation Site

The first step for installing any FibreSTORE RAID system in any rack is to select an appropriate location for the rack. Use the information in Table 2 to prepare the site.

 

Ciprico Rack

 

Disk

Controller

Cache Reten-

 

 

 

 

 

Enclosure

Enclosure

tion Unit

 

 

 

 

 

Dimensions

24" w x 77" h x 35"

17" w x 7" h x

17.5" w x 3.5"

17.5" w x 3.5"

 

d

 

 

 

24" d

h x 24" d

h x 18" d

 

(61 cm x 195.6 cm

(43.2 cm x

(44.5 cm x 8.9

(44.5 cm x 8.9

 

x 88.9 cm)

 

17.8 cm x 61

cm x 61 cm)

cm x 45.7 cm)

 

 

 

 

 

cm)

 

 

 

 

 

 

 

 

Weight

Approximately

 

Approximately

40 lbs (19 Kg)

65 lbs (30 Kg)

 

400 lbs (181.4 Kg)

80 lbs (37 Kg)

with dual

 

 

empty; 1100 lbs

 

 

controllers

 

 

(499 Kg) fully

 

 

 

 

 

assembled

 

 

 

 

 

 

 

 

 

 

Power

200 - 240 VAC,

 

100 - 120 / 200

DC input from

208 to 240

Requirements

50/60 Hz,

 

 

- 240 VAC, 50

FibreSTORE

VAC, 6.5 amp

 

maximum 20

 

/60 Hz, 6/3

disk enclosure,

maximum

 

amps,

 

 

amps

maximum

output

 

single phase

 

 

60 watts

 

 

 

 

 

 

 

 

 

Operating

5°

to 40°

C (41°

to

104° F) with 7,200 rpm drives

 

Temperature

5°

to 35°

C (41°

to 95° F) with 10,000 rpm drives

 

 

 

Rack Plug Type

Dual Power cords have 30A 250V plugs NEMA L6-30P

 

 

 

Cooling

Approximately 10,000 BTU/hr fully assembled

 

Requirements

 

 

 

 

 

 

 

 

 

 

 

Cable Entry

Rear, at bottom of rack

 

 

 

 

Airflow

Through front of disk enclosures and out the top and back of rack

 

 

 

 

 

 

 

Rear clearance

10 inches

 

 

 

 

 

 

 

 

 

 

 

 

Front clearance

6 inches

 

 

 

 

 

 

 

 

 

 

 

 

Top clearance

6 - 12"

 

 

 

 

 

 

 

Side clearances

Ciprico rack has side doors - approximately 2 feet when fully open

 

 

 

 

 

 

 

 

Table 2. Rack and Components Information

 

10FibreSTORE RAID System: Rack Installation Guide

Image 10 Contents
Table of Contents RAID SystemCustomer Service Customer SupportChapter Introduction Back View of FibreSTORE RAID Rack Front View of FibreSTORE RAID Rack Supported Rack Configurations Configuration for One RAID System AAMK36AConfiguration for Two RAID Systems AAMK36A2 Configuration for Three RAID Systems AAMK36A3Configuration for Four RAID Systems AAMK36A4 AAMK36A4 Rack ConfigurationSafety Considerations Preparing the Installation Site WeightInstalling in a Ciprico Rack Overview Preparing the Rack Installing a Cache Retention Unit CRU Installing a CRUCRU Screwed into the Rack Installing a Disk Enclosure Removing Enclosure Slide Rails from the RackRemoving Enclosure Slide Rail from Stationary Flange Mount Installing a Disk Enclosure in the Rack Lifting Disk Enclosure and Aligning Enclosure slidesAdjusting Lock Buttons on Slide Installing a Controller Enclosure Attaching Controller Enclosure Support AnglesInstalling Support Angles Installing Mounting Brackets Putting on the Filler Panels Putting on Filler PanelsFibreSTORE RAID System Rack Installation Guide Chapter Installing in a Generic Rack Installing the Cache Retention Unit CRU Installing Slide Rails on a Disk Enclosure Generic Disk Enclosure Installation Kit SlidesDisk Enclosure Rack Mount Components Installing the Stationary Flange Mount in the Rack Stationary Flange Mount Slide AssemblyInstalling Disk Enclosures into a Rack Aligning Disk Enclosure SlidesReleasing Lock Buttons on Enclosure Slide Releasing Disk Enclosure Front Lock Button Installing the Controller Enclosure Attaching Mounting and Support BracketsInstalling Controller Enclosure Support Brackets Installing the Controller Enclosure FCC Radio Frequency Interference Statement
Related manuals
Manual 36 pages 37.46 Kb