Assembly |
| Test Run |
|
|
|
|
|
|
To attach the elevation crank assembly:
1.Align the flat portion inside the crank bore with the flat portion on the shaft, then place the crank assembly on the elevation shaft.
2.Thread the
Screw
& Washer
Crank
Figure 6. Attaching crank.
3.Attach the dust collection bag to the planer dust outlet by sliding the clamp over the mouth of the bag, placing the bag over the dust outlet, then positioning and locking the clamp over both the bag and the outlet, as shown in Figure 7.
Figure 7. Dust collection bag.
Once the assembly is complete, test run your machine to make sure it runs properly and is ready for regular operation.
The test run consists of verifying the following:
1)The motor powers up and runs correctly, and
2)the safety disabling key on the switch works correctly.
If, during the test run, you cannot easily locate the source of an unusual noise or vibration, stop using the machine immediately, then review Troubleshooting on Page 24.
If you still cannot remedy a problem, contact our Tech Support at (570) 546-9663 for assistance.
To test run the machine:
1.Make sure you have read the safety instruc- tions at the beginning of the manual and that the machine is setup properly.
2.Make sure all tools and objects used during setup are cleared away from the machine.
3.Connect the machine to the power source.
4.Verify that the machine is operating correctly by turning the machine ON.
G0689 13" Planer