Heatcraft Refrigeration Products 25000102 operation manual Service Record, System Reference Data

Page 36

SERVICE RECORD

A permanent data sheet should be prepared on each installation, with a copy for the owner and the original for the installing contractor’s files. If another firm is to handle service and maintenance, additional copies should be prepared as necessary.

System Reference Data

The following information should be filled

out and signed by the Refrigeration Installation Contractor.

Date System Installed:

_______________________ Date Started:

_______________________

Installer and Address:

__________________________________________________________________

 

 

__________________________________________________________________

 

 

__________________________________________________________________

Job Name / Location:

__________________________________________________________________

 

 

__________________________________________________________________

 

 

__________________________________________________________________

Compressor Unit Model:

__________________________________________________________________

Compressor Unit Serial No.: ___________________________________________________________

Electrical :

____________________________

Phase:

_______________________

Condenser Model: _______________________ Serial No.: __________________________

 

Design SST: Group ____________________

Group __________________ Group _________________

Compressor Model / Serial No.

__________________ /

__________________

Group: __________________

Compressor Model / Serial No.

__________________ /

__________________

Group: __________________

Compressor Model / Serial No.

__________________ /

__________________

Group: __________________

Compressor Model / Serial No.

__________________ /

__________________

Group: __________________

Compressor Model / Serial No.

__________________ /

__________________

Group: __________________

Compressor Model / Serial No.

__________________ /

__________________

Group: __________________

Evacuation: # Times __________________

Final Micron: __________________

System Suction P (Group ____): ________________________

System Discharge P: ________________________

System Suction P (Group ____): ________________________

System Discharge P: ________________________

System Suction P (Group ____): ________________________

System Discharge P: ________________________

Ambient: ________________________

 

 

Superheat at Compressors: __________________________________________________________________________

Since product improvement is a continuing effort, we reserve the right to make changes in specifications without notice.

The name behind the brands you trust.

CLIMATE

CONTROL

Commercial Refrigeration Parts

H-IM-PCS-1107 version 000

Heatcraft Refrigeration Products LLC • 2175 West Park Place Blvd., Stone Mountain, GA 30087

 

P: 770.465.5600 • F: 770.465.5990 • www.heatcraftrpd.com

Image 36
Contents Parallel Compressor Systems Table of Contents Introduction InspectionUnit Designation Model DefinitionSystem Warranty RiggingLocation Of Equipment Indoor Clearances Floor & Foundation RequirementsLocation of Equipment Outdoor Ground MountingRoof Mounting Unit Vibration IsolationUnit Access Vertical ClearanceDecorative Fences Units in PitsVentilation Requirements Indoor Units ElectricalRefrigerant Piping Suction P-TrapsRefrigerant Line Insulation Refrigerant Line SupportExpansion Loops Table of Values for LRef. Line Amount of Expansion Pressure Loss of Liquid Refrigerants Equivalent Feet of PipeLiquid Line Rise in Feet Refrigerant 10’ 20’ 25’ 30’ 40’ 50’ 75’ 100’Weight of Refrigerants in Copper Lines During Operation Suction Line at Suction TemperatureLine 40F 20F Recommended Line Sizes for R-404A/R-507 Liquid Line Size Expansion ValveLengths 100’ 150’ 200’ 25’Recommended Line Sizes for R-22 Suction Line SizeCapacity 40˚F 20˚F 10˚F Liquid Line Size Suction Temperature 10˚FRecommended Remote Condenser Line Sizes Net12 & R-134A 502 507 & R-404A TotalLeak Checking, Evacuation and Start-up EvacuationStart-up Refrigerant Distribution Off-CycleElectric Defrost Priority I Hot Gas DefrostElectronic Control System System BalancingSystem Superheat Evaporator SuperheatCompressors Copeland Compressors 4D/6D Solid State ModulesTypical Voltage Ranges Unloader FactorsOil Safety Switch Oil ChargesApproved Copeland Lubricants Carlyle CompressorsPhase Voltage Monitor Part Load Performance MultipliersRequired Differential Pressure for Unloader Operation Sight Glass & Moisture Indicator Sight Glass Safety Relief DevicesHenry Relief Valve Capacity Rating Discharge Piping TableAuto Reset Models Manual Reset ModelsLiquid Level Switch Level Switch TableModule Replacement Oil ControlOil Separators Temprite Valve Adjustment Temprite ModelsOil Level Regulators Troubleshooting Oil System AC&R Model RegulatorsLiquid Filter-Driers & Suction Filters Sporlan Valve CoCompressorMotorBurnoutCleanupProcedure Suction FilterSporlan Valve Company Replaceable Suction FilterType DF for cleanup Type AFD for cleanupSuperior Valve Company Type F FilterRecommended Valve Settings Field AdjustmentHot Gas Bypass Regulator Adjustment Liquid Drain Control MethodControl Settings Control Settings for R-404A/R-507Control Settings for R-22 Low Pressure Switch Setting for RmccGeneral Maintenance Schedule WeeklyMonthly QuarterlySymptom Cause Remedy Compressor TemperatureDoes Not Run Unit ShortSymptom Cause Remedy Low Switch OpenHigh Suction Low SuctionService Record System Reference Data