Alternate Wall Installations
Figure 4
Panel Wall
OPTIONAL SUBBASE
LEVELING SCREW
Figure 5
Frame and Brick Veneer
WOOD FRAME
OPTIONAL SUBBASE
LEVELING SCREW
FRP003
1/4" MIN PROJECTION
STEEL
LINTEL
11" MIN.
WITH SUBBASE
FRP005
Figure 6
Curtain Wall
WALL OR | 1/4" MIN |
WINDOW | PROJECTION |
CASE FLANGE (BY OTHERS)
OPTIONAL SUBBASE
LEVELING SCREW
FRP004
Figure 7
Block and Brick Veneer
1/4" MIN PROJECTION
CONCRETE LINTEL
STEEL
LINTEL
WITHOUT SUBBASE
RECEPTACLE
FINISHED FLOOR | POWER SUPPLY CONDUIT | |
(SUPPLIED BY INSTALLER) | ||
| ||
| FRP006 |
NOTE: | Follow all wall system manufacturer installation instructions. For sunrooms and modular buildings, adhere to their installation instructions for |
| supporting and sealing sleeve to their frames. All wall and window/wall installations must provide for proper drainage. In applications where the |
| drain holes on the PTAC wall sleeve are not exposed beyond the wall an internal drain system is recommended. It is the installer's responsibility |
| to ensure there is adequate drainage for the PTAC unit. |
7