Agilent Technologies 6051A, 6050A manual Controller Connection, Power Test

Page 39

Power Test

Note

The following checkout assumes that the Electronic Load is set to the factory defaults. Refer to Chapter 4

 

if you need to recall the factory default values.

 

 

Use a power supply with the voltage set to 10 V and the current limit set to 10 A to check the input circuit on each module. The settings of the power supply and the values used in the procedure were selected so that they can be used with any module. You can use different settings, but the results of the test will obviously differ from the results shown in the procedure.

1.Connect the power supply to the input binding posts of the first channel in the Electronic Load using heavy wires to minimize the voltage drop in the wires.

2.Observe that the front panel of the Electronic Load displays the voltage that the power supply was set to (10 V).

3.Depress the following front panel keys in the indicated order:

4.Observe that the Electronic Load is drawing 5 A and is operating in CC mode. The power supply should be operating in CV mode. The Electronic Load front panel display should appear about the same as the one shown in Figure 3-7.

Figure 3-7. Power Test Display

5.Depress the key.

6.Observe that the front panel display indicates about 50 W.

7.Repeat the steps 1 through 6 for any other modules m your mainframe.

8Turn off the Electronic Load, disconnect the power supply, and continue with the rear panel connections.

Controller Connection

The GPIB connector on the rear panel connects the Electronic Load to the controller and to other GPIB devices. A GPIB system can be connected in any configuration (star, linear, or both) as long as:

The total number of devices including the controller is no more than 15.

The total length of all cables is no more than 2 meters times the number of devices connected together, up to a maximum of 20 meters.

Note

IEEE Std. 488-1978 states that you should exercise caution if an individual cable length exceeds 4 meters.

Do not stack more than three connector blocks together on any GPIB connector. The resultant leverage can exert excessive force on the mounting panels. Make sure that all connectors are fully seated and that the lock screws are firmly hand- tightened. Use a screwdriver only for the removal of the screws.

Installation 39

Image 39
Contents Operating Manual Certification Safety Summary Manufacturer’s Declaration Safety SummarySymbol Description HerstellerbescheinigungPrinting History Page Table of Contents Local Operation InstallationConsiderations for Operating in Constant Resistance Mode Remote OperationCalibration Page What’s In This Manual OptionsGeneral Information Specifications Safety RequirementsDimensions Page Operation Overview IntroductionLocal/Remote Control Front Panel DescriptionRemote Programming Extended Power Operation Programmable FeaturesModes of Operation Constant Current CC Mode Immediate Current LevelTriggered Current Level Slew Rate Constant Resistance CR ModeTransient Current Level Software Current LimitTransient Resistance Level Constant Voltage CV ModeImmediate Resistance Level Triggered Resistance LevelTriggered Voltage Level Transient Voltage LevelTransient Operation Hpsl Command Description Continuous Transient OperationPulsed Transient Operation Selects the external trigger input Selects pulsed transient operationSets pulse width to 1 millisecond Triggering a transient pulse Triggering a preset levelSelects the external trigger input source Selects toggled operationRisetime Transition Limitation Slew Rate And Minimum Transition TimeTransition Times and Slew Rates Short On/Off Input Current, Voltage, and Power MeasurementSaving and Recalling Settings Reading Remote Programming ErrorsInput On/Off Protection Features Resetting Latched ProtectionStatus Reporting Overpower OvervoltageOvercurrent Remote Sensing Control ConnectorOvertemperature Reverse VoltageExternal Programming Input FaultPage Inspection Installing The ModulesPower Cord Configurations Procedure Channel Number Installing The Mainframes Turn-On Checkout Cooling Rack Mounting Changing Line Voltage Line Voltage SwitchesDisplay Description Gpib ErrorsChannel Errors Description Turn-On/SelftestController Connection Power TestAWG Rear Panel Connectors and SwitchesWire Size Strip back Gpib AddressSense Switch Input Binding Post Control ConnectorCom pin A3 Pins Al and A2+Sand -S IM and VMTrigger Connector Wiring ConsiderationsApplication Connections Remote Sense Connections Stranded Copper Wire Ampere Capacity Wire SizeAmpacity Local Sense ConnectionsZero-Volt Loading Connections Maximum Wire Lengths to Limit Voltage Drops12. Local Sensing 14. Parallel Operation Page Local Operation Local OperationControls and Indicators Description Chan Keys Function Keys Local Control Overview Using The Chan Keys Turning the Input On/Off Using The Function KeysSelecting the Channel Identifying the Selected ChannelRecommended Programming Sequence Examples Setting the Mode of OperationSetting CC Values Programming RangesSetting CR Values Examples Programming Range Setting CV ValuesTransient Operation Shorting The Input Using The System Keys Setting The Gpib AddressDisplaying Error Codes Recalling the Factory Default Values Changing Wake-up SettingsPage Enter Enter/Output StatementsGpib Address OutputOutput 705 Meascurr Sending a Remote CommandSelecting a Channel Getting Data BackRemote Programming Commands Output 705 Chan 2INPUT OFF Output 705MODEVOLT CC Mode ExampleCV Mode Example Output 705INPUT on Output 705MEASCURR?Remote Programming Flowchart Sheet Remote Programming Flowchart Sheet Output 705CHAN 2INPUT OFF Output 705MODECURR CR Mode ExampleOutput 705INPUT on Output 705MEASPOW? Continuous Transient Operation ExamplePulsed Transient Operation Example Synchronous Toggled Transient Operation ExampleOutput 705CHAN 1INPUT OFF Output 705MODEVOLT Output 705 Trigsour TIM Page Calibration Equipment RequiredRecommended Model Calibration CommandsCharacteristics Equipment Required for CalibrationExample Programs Calibration FlowchartsCalibration Flowchart for a Modules Calibration Flowchart for a Modules Calibration Flowchart for a Modules Program Listing for a Modules PausePause Subend Print Voltage Calibration Else END ifLine 610 Set low calibration point Calibration Flowchart for B Modules Calibration Flowchart for B Modules Calibration Flowchart for B Modules Clear Screen Print TABXY10,10CALIBRATION Done Program Listing for B ModulesWait 1260 If Flag then 1270 Output @LdRESReshipt 1280 Considerations For Operating In Constant Resistance Mode Considerations For Operating In Constant Resistance ModeConsiderations For Operating In Constant Resistance Mode Index IndexIndex Index 19, 20, 21 Agilent Sales and Support Offices Agilent Sales and Support OfficesManual Updates