HP E5500-48-POE, 5120 SI, 5120 48G, 5120 EI manual Front mounting position 5120-16G SI/5120-24G SI

Page 31

1.Identify the correct mounting position (see Table 8).

2.Align the round holes in one bracket with the holes in the mounting position.

3.Use screws to fix the mounting bracket to the chassis.

4.Repeat the preceding steps to attach the other mounting bracket to the chassis.

Figure 40 Front mounting position (5120-16G SI/5120-24G SI)

(1) Front panel

Figure 41 Rear mounting position (5120-16G SI/5120-24G SI)

(1) Front panel

Figure 42 Front mounting position (5120-8G-SI)

1

(1) Front panel

Figure 43 Rear mounting position (5120-8G-SI)

(1) Front panel

26

Image 31
Contents HP 5120 EI & 5120 SI Switch Series Page Contents Page Iii Type Product code HP description Alias Models in the HP 5120 EI Switch SeriesModels in the HP 5120 SI Switch Series Product overview5120-24G EI 2 slots/5120-24G EI TAA 2 slots panel views Regulatory Model Numbers in the HP 5120 8G SI Switch Series5120-48G EI 2 slots/5120-48G EI TAA 2 slots panel views 5120-24G EI panel views 5120-48G EI panel views 5120-48G EI switch does not support interface cardsFront panel Front panel 5120-16G SI panel views 5120-8G SI panel views5120-48G SI panel views 5120-24G SI panel views5120-8G-PoE+ SI panel views 5120-8G-PPoE+ SI panel views5120-24G-PPoE+ SI panel views 5120-24G-PoE+ SI panel views Temperature/humidity Preparing for installationSafety recommendations Examining the installation siteHarmful gas limits in the equipment room CleannessLaser safety Dust concentration limit in the equipment roomInstallation tools Hardware installation flow Installing the switchInstallation methods Installing a 5120 EI switch in a 19-inch rackMounting brackets Mounting bracket kit shipped with the 5120 EI switches Rack-mounting by using only front mounting bracketsChassis Front mounting brackets Rear mounting brackets Attach the front mounting brackets to the chassis Attach the front mounting brackets to the rack Rack-mounting by using front and rear mounting brackets Attach the rear mounting brackets to a rack Mount the switch in the rack Attach the front brackets to the rack Installing a 5120 SI switch in a 19-inch rackTo attach the mounting brackets to the switch chassis Attaching the mounting brackets to the switch chassisChassis Bracket view Mounting position Front mounting position 5120-16G SI/5120-24G SI Front mounting position 5120-8G-PoE+ SI/5120-8G-PPoE+ SI Rack-mounting the switch Mount the switch in a rack 5120-16G SI Mounting the switch to a wall Mounting the switch on a workbenchModel Hole distance Installation procedureIntroduction to wall anchor kit Models supporting wall mountingIntroduction to magnetic mounting kit Mounting the switch through magnet mountingMagnet mounting kit Grounding the switch with a grounding strip Grounding the switchPage Make a grounding cable connector Ground through the PE wire of the AC power cord Grounding the switch by using the AC power cordConnecting the AC power cord Connecting the power cordConnect the AC power cord to the 5120-48G EI switch Connecting the switch to a +12 VDC output RPSConnect the RPS cable to the -52 to -55 RPS receptacle Connecting the switch to a -52 to -55 VDC output RPSRemove the filler panel over an interface card slot Installing an interface cardRemoving an interface card Installing/removing a dedicated CX4/SFP+ cableRemoving a dedicated CX4/SFP+ cable Verifying the installationConnection procedure Accessing the switch for the first timeSetting up the configuration environment Connecting the console cableConnection description Setting terminal parametersSet the serial port parameters Set the serial port used by the HyperTerminal connectionHyperTerminal window Verification before power-on Powering on the switchPowering on the switch Description Boot menu optionsEnter 9 to change the startup mode Changing the startup modeEnter Y at the prompt Finished User interface aux0 is available Press Enter to get started IRF fabric setup flowchart Setting up an IRF fabricTo set up an IRF fabric Step Description Planning IRF fabric setupPlanning IRF fabric size and the installation site Identifying the master switch and planning IRF member IDs5120 EI IRF fabric in daisy chain topology Planning IRF topology and connections5120 SI IRF fabric in daisy chain topology Identifying physical IRF ports on the member switchesPlanning the cabling scheme Switch chassis Candidate physical Requirements IRF portsPhysical IRF port requirements Page Shows the IRF fabric topology Configuring basic IRF settingsTo do … Use the command… Connecting the physical IRF portsAccessing the IRF fabric to verify the configuration Display and maintain IRF configuration and running statusConsole login password loss Maintenance and troubleshootingPassword loss Power supply failureAC input Mark State Fan failure only for the 5120 EI switchesConfiguration terminal problems LED behaviors that identify a fan failureChassis Dimensions H × W × D Weight Appendix a Technical specificationsPhysical specifications Chassis dimensions and weightsChassis Operating temperature Relative humidity Environmental specificationsPower specifications Power input typesRPS DC input voltage specifications and RPS compatibility AC input voltage specificationsPower consumption specifications for non-PoE switches Cooling system Power consumption specifications for PoE switchesChassis Fixed fans Appendix B FRUs and compatibility matrixes Interface cards only for the 5120 EI switchesGE SFP+ transceiver modules GE SFP transceiver modulesProduct code Cable description Cable length SFP+ cablesGE XFP transceiver modules Product code Cable description Connector type Cable lengthCX4 cables UTP/STP Page 10/100/1000Base-T Ethernet port Appendix C Ports and LEDsPorts Console portCombo interface only available on the 5120 EI switches LEDs for the 5120 EI switchesSystem status LED RPS status LED Port mode LEDSeven-segment LED Seven-segment LED description 10/100/1000Base-T Ethernet port LED Port mode LED Mode Port LED status Description StatusSFP port LED Power LED LEDs for the 5120 SI switchesInterface card status LED Ethernet port LED description 5120-48G SI RPS status LED descriptionStatus Description Ethernet port LEDs description 5120-16G SI/5120-24G SI Port mode LED Mode Port LED1000Base-X SFP port LEDs description 1000Base-X SFP port LEDContacting HP Support and other resourcesRelated information Convention Description ConventionsConvention Description Network topology icons Index Verifying the installation,43