HP
5120 48G, 5120 SI, 5120 EI, E5500-48-POE
manual
Chassis Fixed fans
Specs
Install
IRF fabric setup flowchart
Password
Connecting the power cord
Configuring basic IRF settings
Planning IRF fabric setup
To do … Use the command…
Connection procedure
Setting terminal parameters
Page 73
Chassis
Fixed fans
5120-8G-PPoE+
SI
1
5120-8G-PoE+
SI
3
5120-24G-PPoE+
SI
3
5120-24G-PoE+
SI
6
68
Page 72
Page 74
Image 73
Page 72
Page 74
Contents
HP 5120 EI & 5120 SI Switch Series
Page
Contents
Page
Iii
Models in the HP 5120 SI Switch Series
Models in the HP 5120 EI Switch Series
Product overview
Type Product code HP description Alias
5120-24G EI 2 slots/5120-24G EI TAA 2 slots panel views
Regulatory Model Numbers in the HP 5120 8G SI Switch Series
5120-48G EI 2 slots/5120-48G EI TAA 2 slots panel views
5120-24G EI panel views
5120-48G EI panel views
5120-48G EI switch does not support interface cards
Front panel
Front panel
5120-16G SI panel views
5120-8G SI panel views
5120-48G SI panel views
5120-24G SI panel views
5120-8G-PoE+ SI panel views
5120-8G-PPoE+ SI panel views
5120-24G-PPoE+ SI panel views
5120-24G-PoE+ SI panel views
Safety recommendations
Preparing for installation
Examining the installation site
Temperature/humidity
Laser safety
Cleanness
Dust concentration limit in the equipment room
Harmful gas limits in the equipment room
Installation tools
Hardware installation flow
Installing the switch
Installation methods
Installing a 5120 EI switch in a 19-inch rack
Mounting brackets
Mounting bracket kit shipped with the 5120 EI switches
Rack-mounting by using only front mounting brackets
Chassis Front mounting brackets Rear mounting brackets
Attach the front mounting brackets to the chassis
Attach the front mounting brackets to the rack
Rack-mounting by using front and rear mounting brackets
Attach the rear mounting brackets to a rack
Mount the switch in the rack
Attach the front brackets to the rack
Installing a 5120 SI switch in a 19-inch rack
To attach the mounting brackets to the switch chassis
Attaching the mounting brackets to the switch chassis
Chassis Bracket view Mounting position
Front mounting position 5120-16G SI/5120-24G SI
Front mounting position 5120-8G-PoE+ SI/5120-8G-PPoE+ SI
Rack-mounting the switch
Mount the switch in a rack 5120-16G SI
Mounting the switch to a wall
Mounting the switch on a workbench
Introduction to wall anchor kit
Installation procedure
Models supporting wall mounting
Model Hole distance
Introduction to magnetic mounting kit
Mounting the switch through magnet mounting
Magnet mounting kit
Grounding the switch with a grounding strip
Grounding the switch
Page
Make a grounding cable connector
Ground through the PE wire of the AC power cord
Grounding the switch by using the AC power cord
Connecting the AC power cord
Connecting the power cord
Connect the AC power cord to the 5120-48G EI switch
Connecting the switch to a +12 VDC output RPS
Connect the RPS cable to the -52 to -55 RPS receptacle
Connecting the switch to a -52 to -55 VDC output RPS
Remove the filler panel over an interface card slot
Installing an interface card
Removing an interface card
Installing/removing a dedicated CX4/SFP+ cable
Removing a dedicated CX4/SFP+ cable
Verifying the installation
Setting up the configuration environment
Accessing the switch for the first time
Connecting the console cable
Connection procedure
Connection description
Setting terminal parameters
Set the serial port parameters
Set the serial port used by the HyperTerminal connection
HyperTerminal window
Verification before power-on
Powering on the switch
Powering on the switch
Description
Boot menu options
Enter 9 to change the startup mode
Changing the startup mode
Enter Y at the prompt
Finished
User interface aux0 is available Press Enter to get started
IRF fabric setup flowchart
Setting up an IRF fabric
To set up an IRF fabric
Planning IRF fabric size and the installation site
Planning IRF fabric setup
Identifying the master switch and planning IRF member IDs
Step Description
5120 EI IRF fabric in daisy chain topology
Planning IRF topology and connections
5120 SI IRF fabric in daisy chain topology
Identifying physical IRF ports on the member switches
Planning the cabling scheme
Switch chassis Candidate physical Requirements IRF ports
Physical IRF port requirements
Page
Shows the IRF fabric topology
Configuring basic IRF settings
Accessing the IRF fabric to verify the configuration
Connecting the physical IRF ports
Display and maintain IRF configuration and running status
To do … Use the command…
Password loss
Maintenance and troubleshooting
Power supply failure
Console login password loss
AC input
Configuration terminal problems
Fan failure only for the 5120 EI switches
LED behaviors that identify a fan failure
Mark State
Physical specifications
Appendix a Technical specifications
Chassis dimensions and weights
Chassis Dimensions H × W × D Weight
Power specifications
Environmental specifications
Power input types
Chassis Operating temperature Relative humidity
RPS DC input voltage specifications and RPS compatibility
AC input voltage specifications
Power consumption specifications for non-PoE switches
Cooling system
Power consumption specifications for PoE switches
Chassis Fixed fans
Appendix B FRUs and compatibility matrixes
Interface cards only for the 5120 EI switches
GE SFP+ transceiver modules
GE SFP transceiver modules
Product code Cable description Cable length
SFP+ cables
GE XFP transceiver modules
Product code Cable description Connector type Cable length
CX4 cables
UTP/STP
Page
Ports
Appendix C Ports and LEDs
Console port
10/100/1000Base-T Ethernet port
Combo interface only available on the 5120 EI switches
LEDs for the 5120 EI switches
System status LED
RPS status LED
Port mode LED
Seven-segment LED
Seven-segment LED description
10/100/1000Base-T Ethernet port LED
Port mode LED Mode Port LED status Description Status
SFP port LED
Power LED
LEDs for the 5120 SI switches
Interface card status LED
Ethernet port LED description 5120-48G SI
RPS status LED description
Status Description
Ethernet port LEDs description 5120-16G SI/5120-24G SI
Port mode LED Mode Port LED
1000Base-X SFP port LEDs description
1000Base-X SFP port LED
Contacting HP
Support and other resources
Related information
Convention Description
Conventions
Convention Description
Network topology icons
Index
Verifying the installation,43
Related pages
Troubleshooting for Samsung LH46CRPMBC/EN
Specification for PYLE Audio PLTS73FX
Battery Indicator Light Status Meaning for Sony PCG-F450
Defiant NC Clearance Chart for 6 Connections only for Vermont Casting 1610
Where to find more help for Linksys E2500
Installing bit for Woodstock W1668
Parts list for Lenovo X61 Tablet
Remote Code List for RCA LCD FLAT PANEL HDTV
Using a Handset, Headset, and Speakerphone for Cisco Systems 7960G
How do I reset my
Samsung LE26R73BD to factory settings
?
Top
Page
Image
Contents